METHOD FOR HORIZONTAL WELL OPERATION Russian patent published in 2012 - IPC E21B43/00 E21B43/32 

Abstract RU 2447265 C1

FIELD: oil and gas industry.

SUBSTANCE: according to the method, a well is operated until water intrusion of production. A pipe string is lowered into a horizontal part of the well, and the annular space is filled with a cement mortar, the cement mortar is squeezed into a borehole environment via the pipe string, and squeezing is stopped, when pressures in the pipe string and the annular space are balanced, the process exposure is carried out for cement setting and hardening, the pipe string is cleaned from cement remains. The process exposure is carried out for at least 3 months with periodical research of the borehole environment with a pulse neutron generator. The process exposure is stopped after readings of the pulse neutron generator are stabilised. Using the readings of the pulse neutron generator, oil zones of a horizontal bore are identified. Oil zones are perforated from the remote end of the horizontal bore to the wellhead. Oil is withdrawn until water intrusion into a zone, the watered zone is isolated, and oil withdrawal continues.

EFFECT: higher efficiency of water inflow isolation in a horizontal bore of a producing well due to increased reliability of a blocking effect with controlled directed impact at zones of bed water inflow.

1 ex

Similar patents RU2447265C1

Title Year Author Number
METHOD FOR ENHANCED OIL RECOVERY FOR DEPOSIT PENETRATED BY HORIZONTAL WELL 2014
  • Fajzullin Ilfat Nagimovich
  • Nabiullin Rustem Fakhrasovich
  • Gusmanov Ajnur Rafkatovich
  • Gubaev Rim Salikhovich
  • Sadykov Rustem Il'Darovich
RU2570157C1
HORIZONTAL WELL OPERATION METHOD 2014
  • Fatkullin Rashad Khasanovich
  • Makhmutov Il'Gizar Khasimovich
  • Bikbulatov Renat Rafaehl'Evich
  • Kadyrov Ramzis Rakhimovich
  • Zijatdinov Radik Zjauzjatovich
RU2558090C1
METHOD FOR ISOLATION OF WATER INFLUX IN HORIZONTAL SHAFT OF PRODUCT WELL 2003
  • Orlov G.A.
  • Musabirov M.Kh.
  • Kadyrov R.R.
RU2247825C1
WATER FLOW ISOLATION TECHNIQUE IN UNCASED HORIZONTAL BOREHOLE SECTION OF PRODUCING WELL 2014
  • Makhmutov Il'Gizar Khasimovich
  • Kadyrov Ramzis Rakhimovich
  • Zijatdinov Radik Zjauzjatovich
  • Nizaev Ramil' Khabutdinovich
  • Khasanova Dil'Barkhon Kelamedinovna
RU2560018C1
WELL SWABBING METHOD 2010
  • Khisamov Rais Salikhovich
  • Shafigullin Rinat Il'Dusovich
  • Torikova Ljubov' Ivanovna
  • Isakov Vladimir Sergeevich
  • Musaev Gajsa Lemievich
RU2410532C1
METHOD OF WATER INFLUX ISOLATION AND LIMITATION TO HORIZONTAL WELLS 2013
  • Il'Jasov Ajdar Martisovich
  • Lomakina Irina Jur'Evna
  • Nigmatullin Timur Ehduardovich
  • Strizhnev Vladimir Alekseevich
RU2528343C1
METHOD OF BOTTOM WATER CONE CUTTING 2016
  • Leontev Dmitrij Sergeevich
  • Kleshchenko Ivan Ivanovich
  • Yagafarov Alik Kayumovich
  • Dolgushin Vladimir Alekseevich
  • Vodorezov Dmitrij Dmitrievich
  • Zemlyanoj Aleksandr Andreevich
  • Sipina Natalya Alekseevna
  • Zhaparova Darya Vladimirovna
RU2655490C2
METHOD FOR ISOLATION OF WATER FLOW IN OPEN HORIZONTAL SECTION PRODUCING WELLS 2015
  • Evdokimov Aleksandr Mikhajlovich
  • Nizaev Ramil Khabutdinovich
  • Novikov Igor Mikhajlovich
  • Bakirov Ilshat Mukhametovich
  • Kadyrov Ramzis Rakhimovich
  • Khasanova Dilbarkhon Kelamedinovna
RU2597220C1
PROCEDURE FOR SELECTIVE ISOLATION AND RESTRAINT OF WATER PRODUCTION INTO HORIZONTAL WELLS 2008
  • Pavlov Ivan Vladimirovich
  • Akimov Nikolaj Ivanovich
  • Kazanbaeva Oksana Vladimirovna
RU2363841C1
METHOD FOR ISOLATION OF WATER INFLUX, GAS INFLUX OR LOST CIRCULATION ZONES 2002
  • Dyblenko V.P.
  • Tufanov I.A.
  • Ovsjukov A.V.
  • Sulejmanov G.A.
RU2228437C2

RU 2 447 265 C1

Authors

Ibragimov Nail' Gabdulbarievich

Torikova Ljubov' Ivanovna

Musaev Gajsa Lemievich

Isakov Vladimir Sergeevich

Dates

2012-04-10Published

2011-05-27Filed