FIELD: mining.
SUBSTANCE: invention relates to mining industry and can be used in dredging of thawed placers. Method includes removal of dead ground from dredging site, digging of drainage trench, pre-dredging of sand layer, removal of boulders, flooding and dredging of sands. Pre-dredging is performed over the uncovered area through sand blading by backhoe excavator, which draws transverse juds in travelling trench.
EFFECT: improved dredger performance, reduced loss of mineral in the soil, and lower unit costs of dredging of hard-dredging placers.
2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF MINING HARD-TO-DREDGE PLACERS | 0 |
|
SU1302774A1 |
METHOD FOR MINING DIFFICULT-TO-DREDGE PLACERS | 1990 |
|
SU1788267A1 |
METHOD FOR DRAINAGE DEVELOPMENT OF PLACERS | 2018 |
|
RU2681168C1 |
METHOD FOR DREDGE WORK OF PLACER DEPOSITS | 2016 |
|
RU2629187C1 |
METHOD OF TIERED GRAVEL DEPOSIT MINING BY CONTINENTAL BUCKET DREDGES | 2006 |
|
RU2330957C1 |
METHOD FOR DEVELOPMENT OF DEEP PLACER DEPOSITS | 1993 |
|
RU2107164C1 |
RESERVES IN THE WORKING SIDES DREDGING DEVELOPMENT METHOD | 2018 |
|
RU2674452C1 |
DEVELOPMENT METHOD OF SHALLOW PERMAFROST TERRACE PLACERS ABOVE FLOOD-PLAIN IN CONDITIONS OF REPEATED DRAGGING | 2009 |
|
RU2420659C2 |
DREDGING METHOD | 2019 |
|
RU2708742C1 |
METHOD FOR PLACER DREDGING | 1990 |
|
RU2024753C1 |
Authors
Dates
2009-02-10—Published
2007-05-28—Filed