FIELD: mining.
SUBSTANCE: facility consists of two-channel head control, packer installed between upper and lower formations, main flow string connected with lower formation and additional flow string. According to the invention when pressure during water pumping into the upper formation exceeds the value of allowed pressure for the flow string, an additional packer is installed above the upper formation. The additional flow string is assembled in a borehole parallel to the main one and is connected to the latter by means of two-channel anchor; the additional flow string is coupled with the anchor by means of a movable sealed connection.
EFFECT: simplification of design, protection of flow string, possibility of formations evaluation and reduced metal consumption of facility.
4 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
INSTALLATION FOR SIMULTANEOUS-SEPARATE PUMPING WATER INTO TWO BEDS | 2007 |
|
RU2353758C2 |
INSTALLATION FOR INTRA-WELL TRANSFER OF WATER FROM LOWER RESERVOIR INTO UPPER ONE (VERSION) | 2007 |
|
RU2351749C1 |
UNIT FOR SIMULTANEOUS SEPARATE PRODUCTION AND INJECTION UNDER CONDITIONS COMPLICATED BY HIGH VISCOSITY OF PRODUCT OF UPPER FORMATION | 2023 |
|
RU2819182C1 |
DEVICE FOR DUAL INJECTION OPERATION TO TWO FORMATIONS OF SAME WELL (VERSIONS) | 2013 |
|
RU2517294C1 |
PUMP PLANT FOR SIMULTANEOUS OR SEPARATE PUMPING OF DISPLACEMENT AGENT TO TWO INTERVALS OF WELL | 2009 |
|
RU2393342C1 |
INSTALLATION FOR SIMULTANEOUS SEPARATE OPERATION OF TWO FORMATIONS BY ONE WELL IN CONDITIONS COMPLICATED BY HIGH VISCOSITY OF PRODUCT OF UPPER FORMATION | 2024 |
|
RU2826680C1 |
PLANT FOR SIMULTANEOUS-SEPARATE PUMPING OF WORKING AGENT | 2012 |
|
RU2475631C1 |
METHOD OF OPERATION OF THE INJECTION WELL WITH SIMULTANEOUS-SEPARATE INJECTION OF FLUID | 2018 |
|
RU2695910C1 |
PACKER SEPARATION DEVICE FOR WELL RESERVOIR OPERATION (VARIANTS) | 2004 |
|
RU2305170C2 |
OPERATION METHOD OF PLUG-IN BOREHOLE ROD PUMP | 2022 |
|
RU2796714C1 |
Authors
Dates
2009-03-20—Published
2007-06-15—Filed