FIELD: construction, road construction.
SUBSTANCE: invention is related to the field of bridge engineering and is intended for erection of pontoon bridges over water obstacles on a tight schedule and with the least material and labour expenses. It is achieved by the fact that pontoon bridge comprises pontoons open at the bottom, on which bridge supports are mounted to carry spans and road way, and spacers that connect peripheral parts of pontoon to fixed anchors on soil, and every pontoon is arranged in the form of packet of vertically oriented adjacent tanks that are inverted upwards with their bottoms and are connected to system of air supply and its pressure control in every of them, at that spacers are located on the opposite sides of pontoon to form triangular figures with every of them, which are oriented in crossing planes, and have dampers and/or control mechanisms, preferably with remote control, their stretching in process of bridge erection and/or its operation. At that vertically oriented tanks form rows of cells in section with horizontal plane, which are evenly located on at least part of section area.
EFFECT: higher reliability of pontoon bridge operation at different dynamic effect at it, also from wave and wind loads due to provision of stability in pontoons that carry spans and provision of their controlled submersion at specified depth.
4 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
BRIDGE AND METHOD OF ITS INSTALLATION | 2016 |
|
RU2640221C1 |
LIFTING DEVICE | 1994 |
|
RU2038281C1 |
HOISTING DEVICE | 1994 |
|
RU2038280C1 |
FLOATING FERRY WITH FLOATING MODULE AND FLOATING SUPPORT WITH PYLON | 2018 |
|
RU2699198C1 |
METHOD FOR TRANSFER OF LONG-SPAN STEAM-AND-WATER MIXTURE DELIVERY PIPELINE OVER CANYON LOCATED IN SEISMICALLY ACTIVE ZONE | 2023 |
|
RU2815705C1 |
CONSTRUCTION METHOD AND DESIGN OF OVERPASSES AND BRIDGES UNDER CONDITIONS OF PERMAFROST | 2012 |
|
RU2513574C2 |
COLLAPSIBLE RAILWAY BRIDGE | 2021 |
|
RU2758302C1 |
METHOD OF CONSTRUCTING AIRSHIP BRIDGE OVER CANYON | 2023 |
|
RU2816641C1 |
BRIDGE | 1992 |
|
RU2049846C1 |
MOTOR ROAD BRIDGE WITH CONTINUOUS REINFORCED CONCRETE SPAN STRUCTURES AND METHOD OF ERECTION THEREOF | 2004 |
|
RU2275451C2 |
Authors
Dates
2009-04-10—Published
2007-09-07—Filed