FIELD: oil and gas industry.
SUBSTANCE: invention is related to oil industry and may find application in repair of well that opened two and more payout beds. Provides for increased efficiency of repair of cemented casing string space of well between neighbouring payout beds. Packer is installed in well, hardening grouting mortar is pumped in casing string space, remains of grouting mortar are washed out, then it is hardened, pressure is reduced and packer is withdrawn. Packer installation is carried out between upper and lower payout beds. Prior to pumping of insulating material under-packer space is filled with insulating material, and packer is installed. To pump insulating material in casing string space, pressure is increased in under-packer space, pressure is reduced in well in above-packer space without pressure drop in under-packer space. Prior to packer withdrawal pressures are equalised in above-packer and under-packer space. After packer withdrawal well is washed from remains of insulating material, and technological exposure is realised for setting and hardening of insulating material.
EFFECT: increased efficiency of repair of cemented casing string space of well between neighbouring payout beds.
1 ex
Title | Year | Author | Number |
---|---|---|---|
PROCEDURE FOR REPAIR OF ANNULUS SPACE OF STRING BOREHOLE WITH TWO EXPOSED FORMATIONS | 2009 |
|
RU2397313C1 |
PROCEDURE FOR REPAIR OF ANNULUS SPACE OF STRING BOREHOLE WITH TWO EXPOSED FORMATIONS | 2009 |
|
RU2397314C1 |
INSULATION METHOD FOR BEHIND-THE-CASING FLOWS IN PRODUCTION WELL | 2020 |
|
RU2739181C1 |
PROCEDURE FOR DEVELOPMENT OF MULTI-PAY OIL DEPOSIT | 2010 |
|
RU2431747C1 |
METHOD FOR ELIMINATION OF FLUID CROSSFLOWS IN A WELL | 2018 |
|
RU2702455C1 |
METHOD FOR MULTIPLE HYDRAULIC FRACTURING OF FORMATION IN HORIZONTAL BOREHOLE OF WELL | 2019 |
|
RU2708747C1 |
METHOD OF CONSTRUCTION OF HORIZONTAL WELL | 2014 |
|
RU2551592C1 |
METHOD OF FORMATION ISOLATION WITH CEMENT-SILICATE MUD | 2012 |
|
RU2519262C1 |
METHOD FOR ELIMINATING FLOWS BEHIND THE CASING IN A PETROLEUM PRODUCTION BOREHOLE FROM AN UNDERLYING AQUIFER | 2021 |
|
RU2776018C1 |
METHOD FOR WELL CONSTRUCTION | 1991 |
|
RU2012777C1 |
Authors
Dates
2009-05-10—Published
2008-05-27—Filed