FIELD: petroleum industry.
SUBSTANCE: claimed is a method for eliminating flows behind the casing in a petroleum production borehole from an underlying aquifer. Method for eliminating flows behind the casing in a petroleum production borehole from an underlying aquifer includes plugging the borehole. Method also includes extracting the downhole equipment; installing a packer plug in the interval of the bottom of the productive formation. A blocking agent is pumped into the perforation channels through the lowered tubing string with the packer; the tubing string with the packer is then raised. Then the packer plug is drilled out. A slot perforator is lowered on a drill pipe string, and perforation is made in the aquifer interval, forming longitudinal slot channels. Then the drill pipes with a perforator are lifted, and an assembly consisting of a tubing string, a wash shoe, and a packer is lowered. A water insulation composition is then injected and pumped into the slot channels. Then the assembly is lifted, and the borehole is left until the cement solidifies. Then a smaller-diameter casing string is lowered into the borehole from the bottomhole to the overlying bed of the aquifer, cemented, and left until the cement solidifies.
EFFECT: created reliable barrier for the ingress of reservoir waters in the space behind the casing between the casing and the rock.
1 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR ELIMINATING FLOWS BEHIND THE CASING IN PETROLEUM PRODUCTION BOREHOLES | 2021 |
|
RU2774251C1 |
CASING ANNULUS PLUGGING METHOD | 2005 |
|
RU2286438C1 |
METHOD OF PREVENTING WATER FLOW IN WELL DEVELOPED OIL IN WATER RESERVOIR | 2017 |
|
RU2665769C1 |
METHOD OF BOTTOM WATER CONE CUTTING | 2016 |
|
RU2655490C2 |
COMPLETION METHOD FOR A PRODUCTION WELL THAT HAS OPENED A TRANSITIONAL ZONE OF A GAS DEPOSIT | 2022 |
|
RU2793351C1 |
METHOD OF CONDUCTING WATER-INSULATING WORKS IN THE EXTRACTING WELL, EXCLUDING THE WATER OIL DEPOSIT | 2017 |
|
RU2661935C1 |
METHOD FOR REPEATED MULTISTAGE HYDRAULIC FRACTURING IN A WELL WITH A HORIZONTAL TAILING-IN USING A CASING STRING OF A SMALLER DIAMETER | 2021 |
|
RU2775112C1 |
METHOD FOR COMPLETING A HORIZONTAL SIDETRACK BOREHOLE FOLLOWED BY MULTI-STAGE HYDRAULIC FRACTURING | 2021 |
|
RU2775628C1 |
WELL COMPLETION METHOD | 2023 |
|
RU2795281C1 |
METHOD OF ISOLATION OF WATER SUPPLY IN OIL-EXTRACTING WELL | 2017 |
|
RU2655495C1 |
Authors
Dates
2022-07-12—Published
2021-06-06—Filed