FIELD: oil and gas industry.
SUBSTANCE: invention is related to oil industry and may find application in development of oil deposit. Oil is withdrawn through production wells to reduce bed pressure in payout beds by at least 50% from the initial one. Low debit production wells are changed over into injection wells or separate injection wells are drilled. Such wells are wells, in which during pumping of working substance, front of working substance does not have time to reach production wells for at least 3 years. At that in recently commissioned injection wells upper bed is cased with operating string, cemented and perforated, and lower bed is developed by open hole without casing. Pumping of working substance through injection wells is carried out to both beds together with preferable flow of working substance to lower bed and preferable development of lower bed stock.
EFFECT: increased oil recovery of deposit with reduced current bed pressure.
1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DEVELOPMENT OF MULTIHORIZONT OIL POOL | 2002 |
|
RU2213854C1 |
METHOD OF HIGH-VISCOSITY OIL POOL DEVELOPMENT | 2008 |
|
RU2344279C1 |
METHOD FOR EXTRACTING NON-HOMOGENOUS MULTIBED OIL DEPOSIT | 2003 |
|
RU2236567C1 |
METHOD OF DEVELOPING IRREGULAR MULTIPLE-ZONE OIL DEPOSIT | 1997 |
|
RU2097536C1 |
METHOD FOR DEVELOPMENT OF OIL POOLS WITH COMMON HYDRODYNAMIC BASIN | 2008 |
|
RU2344276C1 |
METHOD OF DEVELOPING LOW-PERMEABLE OIL DEPOSIT USING SEPARATE INJECTION OF WATER AND GAS | 2018 |
|
RU2731243C2 |
METHOD FOR DEVELOPMENT OF POWERFUL LOW-PERMEABLE OIL DEPOSIT WITH APPLICATION OF WATER AND GAS PUMPING | 2020 |
|
RU2732746C1 |
PRODUCTIVE RESERVOIR DEVELOPMENT METHOD | 2007 |
|
RU2317410C1 |
METHOD FOR HIGHLY-VISCOUS OIL OR BITUMEN DEPOSIT DEVELOPMENT | 2006 |
|
RU2286445C1 |
METHOD OF OIL POOL DEVELOPMENT | 2001 |
|
RU2178066C1 |
Authors
Dates
2009-05-10—Published
2008-05-27—Filed