FIELD: metallurgy.
SUBSTANCE: installation for magnesium-thermal production of sponge titanium consists of electric pit-type heating furnace with apparatus of reduction in form of retort with cover, false bottom and drainage facility. The electric pit-type heating furnace is made with two rows of channels for supply cooling air, with channels for hot air exhaust and with an opening in a hearth. The upper row of channels for supply of cooling air is arranged at a distance from the top of the electric furnace constituting 0.10-0.12 of its height. The second row of channels for supply of cooling air is arranged at a distance from the top of the electric furnace constituting 0.25-0.27 of its height. Channels for hot air exhaust are arranged at a distance from the top of the electric furnace constituting 0.35-0.45 of its height. Also ratio between the retort of the apparatus of reduction and height of electric furnace is 0.85-0.95.
EFFECT: increased efficiency of installation.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
APPARATUS FOR MAGNESIUM-THERMAL PRODUCTION OF TITANIUM SPONGE | 2006 |
|
RU2310001C1 |
INSTALLATION FOR MAGNESIUM-THERMAL PRODUCTION OF SPONGY TITANIUM | 2006 |
|
RU2390573C2 |
TITANIUM SPONGE MAGNESIUM-REDUCED PRODUCTION APPARATUS | 2005 |
|
RU2288962C1 |
DEVICE FOR MAGNESIUM-REDUCED PRODUCTION OF SPONGE TITANIUM | 2004 |
|
RU2265070C1 |
METHOD OF VACUUM SEPARATION OF SPONGY TITANIUM AND DEVICE FOR REALIZATION OF THIS METHOD | 2004 |
|
RU2273675C1 |
ALLOY SPONGY TITANIUM OBTAINING METHOD | 2016 |
|
RU2635211C1 |
INSTALLATION FOR PREPARING SPONGE TITANIUM | 1995 |
|
RU2080399C1 |
METHOD FOR PRODUCTION OF SPONGY TITANIUM | 2014 |
|
RU2586187C1 |
METHOD FOR CONTROLLING THE DISCHARGE OF MAGNESIUM CHLORIDE FROM THE RECOVERY REACTOR AND CONTROLLING THE MAGNETOTHERMAL RECOVERY OF SPONGY TITANIUM | 2021 |
|
RU2770549C1 |
DEVICE FOR MAGNESIUM-REDUCED PRODUCTION OF SPONGE TITANIUM | 2004 |
|
RU2265071C1 |
Authors
Dates
2009-06-10—Published
2007-12-24—Filed