FIELD: engines and pumps.
SUBSTANCE: pump is designed for gas and condensate well test, completion and operation. The pump comprises a body with formed bores and a coupling arrangement connecting the body and a pump-compressor pipe string. Between the body and the coupling arrangement, there is a removable jet pump fixation ring. The jet pump accommodates a flow distributor provided with radial canals and a central actuation gas feed channel with peripheral axial passive gas channels and in-built active jet nozzle. A pipe branch with a mixing chamber the forms a suction chamber. The mixing chamber and a diffusion apparatus are series connected to the pipe branch. The top of the jet pump consists of a pocket, a rod and a grip. The rod and the grip are rigidly connected with a spear pin. The pocket functions as a coupling arrangement that connects the diffusion apparatus and the rod; it has radial holes for well production discharge and a groove for grip arrangement in working condition and with the jet pump removing. In the top of the rod, there is a spear-head. The bottom of the jet pump accommodates a back seat valve mounted in the internal groove of a flow controller connected to the flow distributor. The internal groove ensures to position the jet pump up with the closed back valve to suitable height.
EFFECT: expansion of equipment range.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
BOREHOLE EJECTOR | 2014 |
|
RU2560969C2 |
DEVICE FOR WELL WASHING AND COMPLETION (VERSIONS) | 2002 |
|
RU2213862C1 |
METHOD FOR PROCESSING THE BOTTOM-HOLE ZONE OF THE FORMATION AND A JET PUMP AS PART OF A DEVICE FOR IMPLEMENTING THE METHOD | 2022 |
|
RU2783932C1 |
COMBINED METHOD AND EQUIPMENT FOR OPERATING PRODUCING WELL | 1997 |
|
RU2132933C1 |
METHOD FOR PROCESSING THE BOTTOMHOLE FORMATION ZONE AND THE DEVICE FOR ITS IMPLEMENTATION | 2022 |
|
RU2782227C1 |
SUBSURFACE SAFETY VALVE | 2017 |
|
RU2651860C1 |
JET ASSEMBLY FOR CHEMICAL TREATMENT OF BOTTOMHOLE ZONE | 2006 |
|
RU2330995C1 |
DEVICE FOR REMOVING OF PROCESSING DEPOSITIONS, WASHING AND WELLS DEVELOPMENT WITH LOW FORMATION PRESSURE (VERSIONS) | 2007 |
|
RU2364705C1 |
IMMERSED PUMP-EJECTOR SYSTEM FOR EXTRACTING OIL | 2005 |
|
RU2295631C1 |
METHOD FOR TREATMENT OF BOTTOMHOLE ZONE AND DEVELOPMENT OF WELLS AND JET INSTALLATION FOR IMPLEMENTATION THEREOF | 2021 |
|
RU2822423C2 |
Authors
Dates
2009-07-27—Published
2008-01-09—Filed