FIELD: communication facilities.
SUBSTANCE: invention concerns communication means and is intended for provision of multiplexing scheme with time division multiplex (TDM) for communication line adaptation. Effect is achieved by device design involving measurement of channel assessment and channel quality indicator (CQI) by linking several time intervals of a frame in existing GSM/GPRS/EDGE system. Invention claims algorithm of MC user alternation so as to everyone would benefit from measurement of all time intervals in a frame.
EFFECT: enhanced reliability and accuracy of data transfer.
21 cl, 14 dwg
Authors
Dates
2009-08-10—Published
2005-04-29—Filed