FIELD: oil and gas production.
SUBSTANCE: suggestion is related to oil and gas production industry, in particular to methods for preparation of plugging composition in well in order to carry out repair and insulation works. It includes lowering a perforated nozzle on oil well tubing into operational pipe, serial pumping of structure-forming reagent into oil well tubing, as well as cushion of buffer fluid and structure former and further mixing of structure-forming reagent with structure former as perforated nozzle is lifted on oil well tubing. Inside a perforated nozzle in its upper part there is a through ring installed, and a seat ring is provided in its lower part. After structure-forming reagent exits into tube space, and part of buffer fluid volume goes to oil well tubing, a separating plug is installed. Moment of reagent and buffer fluid volume part exit into tube space is detected by pumping overpressure, which occurs as separating plug is put onto through ring. Seat ring, prior to lift of oil well tubing, is closed with separating plug, therefore it provides for even distribution of structure former in structure-forming reagent by injection of structure former into structure-forming reagent via holes on nozzle body.
EFFECT: improved quality of plugging composition due to improved accuracy of control over volume of mixed components of plugging composition and more even distribution of structure former in structure-forming reagent.
3 cl, 2 dwg, 2 ex
Title | Year | Author | Number |
---|---|---|---|
PREPARATION METHOD OF TWO-COMPONENT PLUGGING COMPOSITION IN WELL | 2008 |
|
RU2386785C1 |
METHOD FOR MAKING-UP GROUTING COMPOUND IN WELL | 2012 |
|
RU2498047C1 |
METHOD OF WATER PRODUCTION ZONES ISOLATION IN WELL | 2013 |
|
RU2540704C1 |
METHOD FOR WATER INFLUX ZONE ISOLATION INSIDE WELL | 2006 |
|
RU2315171C1 |
INSTALLATION METHOD OF CEMENT BRIDGE IN WELL | 2011 |
|
RU2469178C1 |
ISOLATION METHOD OF WELL TROUBLESOME ZONE WITH CARBONATE BASINS | 2012 |
|
RU2494224C1 |
METHOD OF PLACING CEMENT PLUG IN CASED WELL AND DEVICE THEREFOR | 2015 |
|
RU2603110C1 |
METHOD FOR RESTRICTING THE WATER SUPPLY TO THE OIL-WELLING WELL THAT IS EQUIPPED WITH THE DEPTH INSERTED BY THE ROD WELL PUMP | 2016 |
|
RU2646153C1 |
METHOD OF PRODUCTION STRING SEALING | 2017 |
|
RU2669650C1 |
PROCEDURE FOR PLACEMENT OF CEMENT BRIDGING IN WELL | 2010 |
|
RU2435937C1 |
Authors
Dates
2009-11-20—Published
2008-06-07—Filed