FIELD: oil and gas industry.
SUBSTANCE: perforated joint with centraliser and landing ring is run-in at tubing to production string. Gelling agent and soil stabiliser are pumped one by to tubing one through by-pass plug and then mixing of gelling agent and soil stabiliser is made during liftup of the perforated joint at tubing. At that mixing is made under pressure in order to receive grouting compound with required setting time.
EFFECT: allows expansion of dosing range at joint liftup at tubing with simultaneous pumping of gelling agent through radial holes and receiving grouting compound with different physical and chemical properties due to possible regulation of grouting components dosing by surplus pressure.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR PREPARATION OF PLUGGING COMPOSITION IN WELL | 2008 |
|
RU2373376C1 |
METHOD OF WATER PRODUCTION ZONES ISOLATION IN WELL | 2013 |
|
RU2540704C1 |
PREPARATION METHOD OF TWO-COMPONENT PLUGGING COMPOSITION IN WELL | 2008 |
|
RU2386785C1 |
INSTALLATION METHOD OF CEMENT BRIDGE IN WELL | 2011 |
|
RU2469178C1 |
METHOD FOR WATER INFLUX ZONE ISOLATION INSIDE WELL | 2006 |
|
RU2315171C1 |
METHOD OF PLACING CEMENT PLUG IN CASED WELL AND DEVICE THEREFOR | 2015 |
|
RU2603110C1 |
PROCEDURE FOR PLACEMENT OF CEMENT BRIDGING IN WELL | 2010 |
|
RU2435937C1 |
ISOLATION METHOD OF WELL TROUBLESOME ZONE WITH CARBONATE BASINS | 2012 |
|
RU2494224C1 |
INSTALLATION METHOD OF CEMENT BRIDGE IN WELL UNDER INTAKE FORMATION | 2012 |
|
RU2503795C1 |
METHOD FOR RESTRICTING THE WATER SUPPLY TO THE OIL-WELLING WELL THAT IS EQUIPPED WITH THE DEPTH INSERTED BY THE ROD WELL PUMP | 2016 |
|
RU2646153C1 |
Authors
Dates
2013-11-10—Published
2012-06-01—Filed