INSTALLATION METHOD OF CEMENT BRIDGE IN WELL Russian patent published in 2012 - IPC E21B33/16 

Abstract RU 2469178 C1

FIELD: oil and gas industry.

SUBSTANCE: installation method of cement bridge in the well involves lowering to the well perforation interval of tubing string (TS) equipped with special connection pipe, pumping of visco-elastic separating agent portions, flushing of separating plugs, tubing string lifting and anticipation of cement solution hardening. Prior to pumping of visco-elastic separating agent there performed is simultaneous locking of perforation interval with gel, which is 45-55 m higher than perforation interval; the first separating plug is forced; the first portion of visco-elastic separating agent, cement grouting, the second portion of visco-elastic separating agent is pumped with further flushing with the second separating plug. As visco-elastic separating agent there used is water suspension of PBMG gel powder with density of 1100 kg/m3 and static shear stress (SSS10s/10min)=134/215 dPa.

EFFECT: avoiding the displacement of cement bridge downwards from planned installation interval owing to locking the gel perforation interval and improving the strength and quality of bridge owing to eliminating the dilution of cement grouting with well fluid during formation of cement stone.

1 tbl, 6 dwg

Similar patents RU2469178C1

Title Year Author Number
METHOD FOR SETTING CEMENT BRIDGE 0
  • Khoryushin Igor Grigorevich
  • Khoryushin Andrej Igorevich
SU1744241A1
METHOD OF REPAIR-INSULATION WORKS IN OIL AND GAS WELL 2019
  • Klimov Vyacheslav Vasilevich
  • Arestenko Yurij Pavlovich
  • Burkova Anastasiya Alekseevna
RU2723416C1
METHOD OF RECOVERY OF BOTTOM-HOLE FORMATION ZONE OF GAS WELL 2000
  • Tagirov K.M.
  • Dubenko V.E.
  • Andrianov N.I.
  • Zinov'Ev V.V.
RU2183724C2
METHOD OF ISOLATION OF WATER SUPPLY IN OIL-EXTRACTING WELL 2017
  • Leontev Dmitrij Sergeevich
  • Kleshchenko Ivan Ivanovich
  • Sipina Natalya Alekseevna
  • Kasov Artem Mikhajlovich
RU2655495C1
TECHNOLOGY OF REPEAT OPENING OF STRATUM 2001
  • Kapyrin Ju.V.
  • Taratyn M.Eh.
  • Khrapova E.I.
RU2183257C1
METHOD FOR PLACING CEMENT BRIDGING PLUGS IN WELLS WITH LOST CIRCULATION 0
  • Klevtsur Anatolij Petrovich
  • Kozubovskij Aleksandr Gennadevich
  • Bilashchuk Vladimir Vasilevich
SU1789662A1
METHOD TO INCREASE WELL PRODUCTIVITY 2012
  • Demichev Sergej Semenovich
  • Demichev Semen Sergeevich
  • Demichev Pavel Sergeevich
  • Chapurin Viktor Anatol'Evich
  • Parshikov Nikolaj Nikolaevich
  • Gumerova Ekaterina Vladimirovna
  • Fominykh Oleg Valentinovich
RU2492317C1
TECHNIQUE FOR ISOLATION OF HIGHLY PENETRABLE INTERVALS OF SEAM IN WELL 2000
  • Gumerskij Kh.Kh.(Ru)
  • Dzhafarov I.S.(Ru)
  • Shakhverdiev Azizaga Khanbaba Ogly
  • Panakhov Gejlani Minkhadzh Ogly
RU2159328C1
INSTALLATION METHOD OF BRIDGE CUTTING OFF BELOW-LYING OIL FORMATION 2012
  • Kadyrov Ramzis Rakhimovich
  • Andreev Vladimir Aleksandrovich
  • Patlaj Anton Vladimirovich
  • Akuljashin Vladimir Mikhajlovich
  • Shagimardanov Ravgat Saljakhutdinovich
RU2494227C1
METHOD FOR TEMPORARILY BLOCKING A PRODUCTIVE FORMATION UNDER CONDITIONS OF ABNORMALLY LOW FORMATION PRESSURES 2022
  • Gasumov Ramiz Alidzhavad-Ogly
  • Minchenko Yuliya Sergeevna
  • Kostyukov Sergej Vladimirovich
  • Tolpaev Vladimir Aleksandrovich
RU2788935C1

RU 2 469 178 C1

Authors

Kadyrov Ramzis Rakhimovich

Zhirkeev Aleksandr Sergeevich

Sakhapova Al'Fija Kamilevna

Andreev Vladimir Aleksandrovich

Khasanova Dil'Barkhon Kelamedinovna

Dates

2012-12-10Published

2011-06-27Filed