FIELD: oil-and-gas production.
SUBSTANCE: invention related to oil-and-gas production, can be used in tubing string manufacturing and maintenance. Tubing string maintenance method includes of external and internal pipe surfaces cleaning out of deposits and contamination, linering, ends cuttings, threading, fixing of sleeve and safety units. During external and internal pipe surfaces cleaning, pipe itseff heated up till deposits and contamination became fragile and possible to be destroyed with shot blasting, and internal surface shot blasted. After linering wash linered pipe, dry, shot blast its internal surface, cover internal surface with polymer and heat the pipe up till polymer coating is fixed. After lined pipe ends cut, execute liner ends and tubing string welding and cleaning. Before linering between liner and repaired pipe locate sealing material and after washing and drying heat up lined pipe till sealing material fixed or during internal surface coating heating.
EFFECT: resistance increase against asphalt paraffin deposits inside the well.
3 cl
Title | Year | Author | Number |
---|---|---|---|
PROCESS SYSTEM FOR TUBING STRING REPAIR | 2008 |
|
RU2376444C1 |
METHOD OF TUBING REPAIR | 2007 |
|
RU2338053C2 |
METHOD OF REPAIRING AND RESTORATION OF PIPES IN THE IMMEDIATE VICINITY OF THEIR PLACE OF OPERATION AND COMPLEX FOR ITS IMPLEMENTATION | 2022 |
|
RU2790751C1 |
PROCEDURE FOR REPAIR OF FLOW STRING BY BANDING | 2007 |
|
RU2358183C2 |
METHOD FOR RESTORING SERVICE PROPERTIES OF TUBING STRING BY LINERING | 2014 |
|
RU2566520C1 |
TUBING STRING | 2012 |
|
RU2487229C1 |
ISOLATION METHOD OF BLOWHOLES IN INTERNAL PIPELINES AND DEVICE FOR ITS IMPLEMENTATION | 2013 |
|
RU2511912C1 |
METHOD OF REPAIRING FIBERGLASS PIPELINE USING ADAPTER | 2019 |
|
RU2731079C1 |
METHOD OF REPAIRING FIBERGLASS PIPES USING THREADED INSERT | 2020 |
|
RU2742961C1 |
METHOD OF PRODUCING BIMETAL STRING | 2014 |
|
RU2578291C2 |
Authors
Dates
2009-12-10—Published
2008-12-10—Filed