FIELD: oil and gas industry.
SUBSTANCE: isolation method of water influx to well involves pumping via tubing string to water influx interval of isolation compound, gelling agent and cement solution, technological exposure and development of well. Isolation compound contains the following, wt %: sodium silicate with silica module 2.6-5.0 4-20, water-soluble polymer 0.05-0.3, and fresh water is the rest. Water solution (10-15%) of chlorhydric acid in quantity of 0.5-5.0% of compound volume is used as gelling agent for isolation. Gelling agent is pumped separately after isolation compound is pumped and pumping is performed in cycles. During the first 1 to 3 cycles there used is aerated isolation compound and gelling agent; in next cycles there used is non-aerated isolation compound and gelling agent; then, cement mortar is pumped and process exposure is performed.
EFFECT: increasing efficiency of isolation works.
3 ex
Title | Year | Author | Number |
---|---|---|---|
LIMITATION OF WELL WATER PRODUCTION | 2013 |
|
RU2525079C1 |
METHOD FOR REPAIR AND INSULATION WORKS IN WELL | 2014 |
|
RU2580534C1 |
METHOD OF WATER INFLOW LIMITATION IN FLOODED CARBONE RESERVOIRS | 2016 |
|
RU2619778C1 |
METHOD OF WELL WATER PRODUCTION ZONE ISOLATION | 2012 |
|
RU2504640C1 |
WELL INFLOW AREAS ISOLATION TECHNIQUE | 2006 |
|
RU2324807C2 |
PROCEDURE FOR RECOVERY OF TIGHTNESS IN FLOW STRING OF WELL | 2010 |
|
RU2412333C1 |
METHOD OF ELIMINATION OF LEAKAGE OF PRODUCING WELL COLUMN | 2007 |
|
RU2340761C1 |
METHOD FOR DOING REPAIR-ISOLATION WORKS UNDER CONDITIONS OF INTENSE ABSORPTION | 2009 |
|
RU2405926C1 |
METHOD FOR REPAIR AND INSULATION WORKS IN WELL | 2015 |
|
RU2601888C1 |
WATER INFLOW SHUTOFF METHOD IN FRACTURED CARBONATE RESERVOIRS | 2014 |
|
RU2571474C1 |
Authors
Dates
2011-08-10—Published
2010-08-26—Filed