FIELD: oil-and gas industry.
SUBSTANCE: method includes oil withdrawal through a production wells, and working agent injection through injection wells in a cyclic regime: 10-20 days - injection, 10-20 days - stop. Execute injection wells research. All the injection wells connected hydro-dynamically connected via surface pipeline system with the working agent overflow ability. Injection wells during the working agent injection to be stopped and started simultaneously. Execute injection wells research at the moon monthly ebbs and tides average values. In injection wells where the reservoir opened over the water-oil contact level- WOL, execute an additional reservoir opening under the WOL level. Stop working agent injection only in period of monthly moon reservoir waters tide.
EFFECT: oil field production efficiency increase because of the working agent injection cyclic regime in a period of the moon monthly ebb and tide.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
OIL DEPOSIT DEVELOPMENT METHOD | 2011 |
|
RU2457321C1 |
PROCEDURE FOR DEVELOPMENT OF OIL DEPOSIT | 2010 |
|
RU2421607C1 |
PROCEDURE FOR DEVELOPMENT OF OIL-WATER DEPOSIT | 2010 |
|
RU2431737C1 |
PROCEDURE FOR DEVELOPMENT OF OIL-WATER DEPOSIT | 2010 |
|
RU2421606C1 |
METHOD FOR OIL FIELD DEVELOPMENT | 2006 |
|
RU2302517C1 |
OIL FIELD DEVELOPMENT METHOD | 2006 |
|
RU2303126C1 |
OIL DEPOSIT DEVELOPMENT METHOD | 2008 |
|
RU2346150C1 |
METHOD TO DEVELOP OIL POOL | 2011 |
|
RU2463444C1 |
RECOVERY METHOD OF OIL-SOURCE FIELDS | 2016 |
|
RU2612063C1 |
RECOVERY METHOD FOR OIL-SOURCE CARBONATE RESERVOIRS | 2016 |
|
RU2612062C1 |
Authors
Dates
2010-01-20—Published
2008-09-02—Filed