FIELD: machine building.
SUBSTANCE: method includes introduction of plastic pipe into repaired steel pipe. In the beginning of pipeline it is installed block of continuous manufacturing of pipe. Front part of manufactured plastic pipe is connected by rope with tractive member, installed in end point of repaired pipe. Then it starts process of continuous manufacturing of plastic pipe with its simultaneous feeding into repaired pipe and filling of pace between pipes by substance with adjourned time of polymerisation. Polymerisation time is assigned more than time for passing of plastic pipe in repaired pipe. Technological complex for method implementation contains block of continuous manufacturing of plastic pipe, implemented in the form of device for one-layered or multilayer extrusion and/or casting and/or facing of plastic. In the end of repaired steel pipe it is installed tractive member with flexible tractive member, free end of which is connected to front part of plastic pipe.
EFFECT: reduction of repair time, reduction of materials consumption, increasing of extension of repaired pipeline.
24 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD AND COMPLEX TO RUN PIPELINES | 2008 |
|
RU2366849C1 |
METHOD FOR REPAIRING TUNNEL MANIFOLDS AND UNDERGROUND PIPELINES | 2016 |
|
RU2630629C2 |
METHOD FOR TRENCHLESS RECONSTRUCTION OF INTERNAL SURFACE OF CULVERT SYSTEM | 2016 |
|
RU2620479C1 |
TECHNOLOGICAL COMPLEX FOR APPLYING COATS ON PIPE INNER SURFACE | 2008 |
|
RU2406575C2 |
FLOATING WATER TREATMENT COMPLEX | 2011 |
|
RU2490218C2 |
TECHNICAL RESERVOIR OF THE COMPLEX OF WASTEWATER TREATMENT AND METHOD OF ITS TRANSPORTATION, AND THE COMPLEX AND METHOD OF TREATMENT OF WASTEWATER WATER TYPE | 2016 |
|
RU2624709C1 |
DESIGN FOR INNER PROTECTION OF CULVERT SYSTEMS AND METHOD OF CARRYING OUT RECONSTRUCTION WORKS WITH IT (VERSIONS) | 2016 |
|
RU2620478C1 |
METHOD AND DEVICE OF PRODUCING TUBES (VERSIONS) | 2008 |
|
RU2401737C2 |
METHOD OF PIPELINE REHABILITATION, MOBILE REPAIR COMPLEX FOR REHABILITATION AND PIPELINE COVERING EQUIPMENT | 2007 |
|
RU2324103C1 |
PLANT FOR MICROBIOLOGICAL TREATMENT OF EFFLUENTS | 2011 |
|
RU2490215C2 |
Authors
Dates
2010-01-20—Published
2008-10-15—Filed