FIELD: oil-and-gas industry.
SUBSTANCE: invention related to oil field development. Method includes dislocation of production and injection wells, pumping a driving fluid through injection wells and product withdrawal through production wells. Additionally define product flooding velocity. Then at the late stage of oil field development, in dependence of the product flooding velocity during production process, gradually transfer production wells, which was flooded at first and which product water content increased 15-20% a year into injection, or execute wells killing. The transfer well of the second group, which product water content increased 5-15% a year into injection, with preliminary pumped in ticked driving medium. Then transfer well of the third group, located closer to production wells constrict rows and oil stagnation zones, which product water content increased 1-5% a year.
EFFECT: oil fields development efficiency increase due to gradual transfer flooded production wells into injection, oil surface efficiency increase, cost cutting due corresponding to water production decrease, pumping it driving medium.
1 ex, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF OIL FIELD DEVELOPMENT | 2001 |
|
RU2189438C1 |
METHOD OF DEVELOPING OIL DEPOSITS IN FRACTURED RESERVOIRS | 2007 |
|
RU2351752C1 |
OIL DEPOSIT DEVELOPMENT METHOD | 2023 |
|
RU2819871C1 |
METHOD OF OIL POOL DEVELOPMENT | 2001 |
|
RU2191255C1 |
METHOD OF DEVELOPMENT OF OIL POOL | 1996 |
|
RU2090745C1 |
METHOD OF DEVELOPING OIL DEPOSIT IN CARBONATE RESERVOIRS OF FISSURED TYPE | 1996 |
|
RU2101474C1 |
PROCEDURE FOR DEVELOPMENT OF HYDROCARBON DEPOSIT | 2012 |
|
RU2490437C1 |
LAYERED OIL RESERVOIR DEVELOPMENT METHOD | 2021 |
|
RU2755114C1 |
OIL DEPOSIT DEVELOPMENT METHOD | 2019 |
|
RU2721619C1 |
METHOD FOR EXPLOITATION LAYERED OIL STRATA INHOMOGENEOUS IN PERMEABILITY | 1991 |
|
RU2068947C1 |
Authors
Dates
2010-02-10—Published
2008-09-02—Filed