FIELD: mining.
SUBSTANCE: method of development of steeply dipping ore bodies by systems with shrinkage in not-enough stable surrounding rocks, including preparation and cutting of block by deliveries 1,2,3, break, partly and total discharge through loading hatches 4 shrinked ore. During break and partly discharge of ore it is formed inside the magazine artificial massif of muck in the form of vertical column 5, and ore yield from artificial massif is implemented after full discharge of shrinked ore.
EFFECT: invention provides ensured by management of confining pressure in the range of block increasing of its working length, and work front in breakage face and effectiveness increase of stoped excavation.
4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DEVELOPING LOW-POWERED STEEL ORE BODIES | 2021 |
|
RU2757619C1 |
METHOD FOR DEVELOPING THIN AND LOW-POWERED STEEL-FALLING ORE BODIES | 2021 |
|
RU2755287C1 |
PROCESS OF DEVELOPMENT OF COMPLEX-STRUCTURED DEPOSITS | 2002 |
|
RU2223401C2 |
METHOD FOR DEVELOPING THIN AND LOW-POWERED STEEL-FALLING ORE BODIES | 2021 |
|
RU2762170C1 |
METHOD OF DEVELOPMENT OF STEEP ORE | 2007 |
|
RU2352778C1 |
METHOD FOR ORE BODY CONTINUOUS WORKING | 0 |
|
SU1739033A1 |
METHOD FOR ORE BODY CONTINUOUS WORKING | 0 |
|
SU1739032A1 |
METHOD OF MINING STEEP-SLOPE ORE-BODIES | 0 |
|
SU1083662A1 |
METHOD FOR WORKING STEEP ORE BODIES | 0 |
|
SU1739031A1 |
METHOD OF MINING ORE BODIES | 2022 |
|
RU2796836C1 |
Authors
Dates
2010-04-10—Published
2008-09-25—Filed