FIELD: oil-and-gas production.
SUBSTANCE: method includes definition of all information by defect interval, downlifting and installation of additional volatile string with fixing opposite to defect interval with following cementing. After definition of the interval of defect section it is implemented preliminary cementing of internal defect section by all length. After solidification of cement it is implemented mill operation of defect section. Before downlifting additional volatile string higher than defect section is outfitted by external centraliser. From the top additional string is outfitted by mechanical tinted boxes, fixing it relative to string so that additional string overlaps all cut defect section.
EFFECT: there are increased technological properties, increases reliability.
4 dwg
Title | Year | Author | Number |
---|---|---|---|
CASING STRING SERVICE METHOD FOR WELLS WITH DEFECTIVE SECTION AND INTERNAL CASING STRING RESTRICTION | 2007 |
|
RU2347888C1 |
REPAIR METHOD FOR WELL WITH DEFECTIVE AREA WITH DISPLACED CASING STRING | 2012 |
|
RU2515739C1 |
METHOD OF REPAIR OF CASED STRING IN WELL WITH DEFECT SECTION AND WITH INTERIOR NARROWING | 2007 |
|
RU2350735C1 |
CASING STRING REPAIR METHOD IN WELL (VERSIONS) | 2019 |
|
RU2715481C1 |
REPAIR METHOD OF CASING STRING IN WELL WITH DEFECTIVE SECTION | 2012 |
|
RU2501935C1 |
REPAIR METHOD OF CASING STRING IN WELL WITH DEFECTIVE AREA | 2012 |
|
RU2510452C1 |
METHOD FOR CASING PIPE REPAIR IN WELL | 2004 |
|
RU2273718C1 |
METHOD OF WELL REPAIR AT ISOLATION OF BEHIND--CASING FLOWS | 2013 |
|
RU2516670C1 |
METHOD OF REPAIRING CASING STRING IN NON-CEMENTED PART (EMBODIMENTS) | 2020 |
|
RU2732167C1 |
RECOVERY OF CHEMICALLY WORN SECTIONS OF PRODUCTION STRING WITH HELP OF GALVANIC IRONING | 2013 |
|
RU2525387C1 |
Authors
Dates
2010-04-20—Published
2009-01-30—Filed