FIELD: oil-and-gas industry.
SUBSTANCE: proposed method comprises detection of high corroded sections and filling the well with two-component mortar. The latter consists of iron chloride and sodium chloride. Assembly composed by iron pig with centraliser anode and heater is run on cable. Heater is located above anode while mortar is heated to 95-100°C. Voltage is fed in between operation string and node at current density of 10-20 A/dm2 Said assembly is smoothly lifted along operation string with stops at high chemical wear sections for their galvanic ironing.
EFFECT: higher efficiency of recovery.
7 cl
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CASING PIPE REPAIR IN WELL | 2004 |
|
RU2273718C1 |
CASING STRING REPAIR METHOD IN WELL (VERSIONS) | 2019 |
|
RU2715481C1 |
METHOD OF CORROSION PROTECTION OF SUBMERSIBLE PUMP UNIT BY LINING EXTERNAL SURFACE OF ASSEMBLIES THEREOF | 2019 |
|
RU2734201C1 |
METHOD OF SECONDARY CEMENTING OF PROCESS WELL OF UNDERGROUND RESERVOIRS OF VARIOUS PURPOSE | 2012 |
|
RU2485283C1 |
SEALING METHOD FOR PRODUCTION STRING DISORDERS | 2015 |
|
RU2592309C1 |
DEVICES WITH COATINGS FOR OPERATION OF OIL AND GAS WELLS | 2009 |
|
RU2529600C2 |
ANTIFRICTION COATINGS WITH IMPROVED ABRASION AND WEAR PROPERTIES AND METHODS OF MAKING SAME | 2013 |
|
RU2653379C2 |
REPAIR METHOD OF STRING WITH DEFECT SECTION AND INTERNAL TAPERING OF STRING | 2009 |
|
RU2386779C1 |
CENTRALISER FOR CENTERING AUXILIARY CASING PIPE INSIDE MAJOR CASING PIPE AND METHOD FOR MANUFACTURING THEREOF | 2008 |
|
RU2387793C1 |
WELL REPAIR METHOD | 2012 |
|
RU2494222C1 |
Authors
Dates
2014-08-10—Published
2013-06-17—Filed