FIELD: oil and gas industry, particularly to repair damaged casing pipes in wells.
SUBSTANCE: method involves determining damaged casing pipe interval; lowering and pressing-out outer longitudinally corrugated patch to depth below damaged interval; lowering inner longitudinally corrugated patch and pressing-out thereof so that inner patch overlaps outer one; lowering additional shifting pipe in well; fixing thereof by resting pipe end onto upper ends of doubled patch and cementing thereof.
EFFECT: increased efficiency, reduced time of repair work performing and reduced material consumption.
3 cl, 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD OF REPAIR OF CASED STRING IN WELL WITH DEFECT SECTION AND WITH INTERIOR NARROWING | 2007 |
|
RU2350735C1 |
CASING STRING SERVICE METHOD FOR WELLS WITH DEFECTIVE SECTION AND INTERNAL CASING STRING RESTRICTION | 2007 |
|
RU2347888C1 |
REPAIR METHOD OF STRING WITH DEFECT SECTION AND INTERNAL TAPERING OF STRING | 2009 |
|
RU2386779C1 |
CASING STRING REPAIR METHOD IN WELL (VERSIONS) | 2019 |
|
RU2715481C1 |
METHOD FOR WELL REPAIR | 2008 |
|
RU2354803C1 |
WELL REPAIR METHOD | 2012 |
|
RU2498045C1 |
RECOVERY OF CHEMICALLY WORN SECTIONS OF PRODUCTION STRING WITH HELP OF GALVANIC IRONING | 2013 |
|
RU2525387C1 |
METHOD OF REPAIRING CASING STRING IN NON-CEMENTED PART (EMBODIMENTS) | 2020 |
|
RU2732167C1 |
CASING REPAIRS METHOD | 0 |
|
SU1686124A1 |
WELL EFFICIENCY RECOVERY AND START UP OF STAND BY WELLS WITH COMPLICATED DESIGN COLLECTORS IN ALFP CONDITIONS AND PRODUCTION STRING BOTTOM PART COLLAPSE | 2008 |
|
RU2379498C1 |
Authors
Dates
2006-04-10—Published
2004-07-02—Filed