METHOD FOR SOIL REINFORCEMENT IN AREA OF PIPELINE INSTALLATION Russian patent published in 2010 - IPC F16L1/28 

Abstract RU 2389931 C1

FIELD: construction.

SUBSTANCE: method for reinforcement of soil in area of pipeline installation includes formation of trench, having shape of isosceles trapezoid in cross section, placed with smaller base down, by excavation of subsiding soil to a designed depth, laying of flexible mat, its fixation by anchors and filling of trench, at that soil is excavated to the depth of at least 0.5 metre below the level of pipeline foot, width of trapezoid lower base makes at least 0.5 metre, distance between trapezoid ribs at the level of pipeline foot makes at least four radiuses of pipeline, angle of trench slope location should make not more than 45 degrees, and after formation of trench soil is laid in layers to the level of pipeline foot with compaction of each layer to a specified module of elasticity, then flexible mat is laid onto compacted bottom and walls of trench, and flexible mat is arranged in the form of geogrid from glass fibre with overlap of at least 0.30 m and rupture strength of not less than 30 kH/m. Fixation of geogrid from glass fiber with anchors is done on both sides of upper base of formed trench. Trench is filled so that height of soil over upper point of pipeline makes at least 0.2 metre and not more than 0.3 metre from upper point of pipeline to earth surface. Afterwards glass fiber geogrid with rupture strength of at least 30 kH/m2 is laid onto soil surface, and final soil is filled to the level of earth surface.

EFFECT: reinforcement of soil making it possible to tightly fix pipeline in the area of its installation with simultaneous reduction of stretching forces effect at pipeline.

3 cl, 1 dwg

Similar patents RU2389931C1

Title Year Author Number
METHOD OF LAYING UNDERGROUND PIPELINE IN SETTLEMENT SOILS (VERSIONS) 2004
  • Mukhametdinov Kh.K.
RU2249144C1
PIPELINE DIKE REINFORCEMENT METHOD 2008
  • Budnikov Vladimir Gennad'Evich
  • Sysoev Jurij Sergeevich
  • Podbornyj Evgenij Evseevich
RU2369797C1
CONSTRUCTION OF EARTH ROADBED 2004
  • Jarmolinskij Apolenar Ianovich
  • Pegin Pavel Anatol'Evich
  • Jarmolinskij Vladimir Apolenarovich
RU2288986C2
METHOD FOR PRODUCTION OF FLEXIBLE IMPERVIOUS SCREEN 2013
  • Shchedrin Vjacheslav Nikolaevich
  • Kosichenko Jurij Mikhajlovich
  • Chernov Mikhail Aleksandrovich
  • Korenovskij Aleksandr Mikhajlovich
RU2530989C2
METHOD OF ERECTION OF TECHNOLOGICAL PASSAGE ALONG PIPE LINE ROUTE (VERSIONS) AND DEVICE FOR REALIZATION OF THIS METHOD 2003
  • Mukhametdinov Kh.K.
RU2220350C1
DEVICE FOR SECURING PIPE LINE 2001
  • Azarov V.S.
RU2193714C1
METHOD OF LAYING PIPE LINES (VERSIONS) AND DEVICE FOR REALIZATION OF THIS METHOD 2004
  • Mukhametdinov Kh.K.
RU2244191C1
MULTI-LAYER ANTI-FILTRATION COATING 2013
  • Shchedrin Vjacheslav Nikolaevich
  • Kosichenko Jurij Mikhajlovich
  • Chernov Mikhail Aleksandrovich
  • Korenovskij Aleksandr Mikhajlovich
  • Agafonov Sergej Vladimirovich
RU2542148C2
METHOD OF PIPELINE LAYING IN THAWED INSULAR PERMAFROST COLLAPSING SOILS 2016
  • Akhmetov Albert Khamitovich
RU2622681C1
ARTIFICAL TRENCH FOR MAIN PIPELINE, METHOD OF ITS BASE CONSTRUCTION (VERSIONS), BASE (VERSIONS), AND DEVICE FOR BASE CONSTRUCTION 2007
  • Saljukov Vjacheslav Vasil'Evich
  • Mukhametdinov Kharis Kas'Janovich
  • Velijulin Ibragim Ibragimovich
RU2340824C1

RU 2 389 931 C1

Authors

Sirotenko Andrej Nikolaevich

Dates

2010-05-20Published

2008-11-11Filed