FIELD: construction engineering; erection of main pipe lines laid in water-deposited sections of route. SUBSTANCE: filling-up earth above pipe line is compacted to obtain strength of surrounding ground of intact structure. Loose ground laid above pipe line and banks of compacted ground on bottom of trench take up vertical operational displacement of pipe line. EFFECT: enhanced reliability of pipe line. 5 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR PROTECTING ANCHORS FROM PIPELINES | 2003 |
|
RU2245475C2 |
METHOD OF ERECTION OF PIPE LINE IN PERMAFROST SOILS (VERSIONS) | 2004 |
|
RU2244192C1 |
PIPELINE FASTENING DEVICE | 2002 |
|
RU2217646C2 |
PIPELINE SECURING METHOD | 2001 |
|
RU2227238C2 |
METHOD FOR LAYING PIPELINE IN A SWAMP | 2002 |
|
RU2227857C1 |
METHOD FOR ERECTION OF PIPELINE IN FROZEN AND WATERLOGGED SOIL | 2010 |
|
RU2452886C2 |
METHOD FOR LAYING OF UNDERGROUND PIPELINE | 2016 |
|
RU2613151C1 |
METHOD OF BUILDING TECHNOLOGICAL CROSSING OVER OBSTACLE (VERSIONS) | 2003 |
|
RU2221954C1 |
METHOD TO INSTALL UNDERGROUND PIPELINE | 2011 |
|
RU2455551C1 |
METHOD OF BALLASTING SUBTERRANEAN PIPE LINE | 1998 |
|
RU2153119C2 |
Authors
Dates
2002-11-27—Published
2001-03-29—Filed