FIELD: construction, road engineering.
SUBSTANCE: method for replacement of sleepers consists in disassembly of intermediate rail joints, removal of defect sleeper and installation of new one in its place. After the lining has been unfixed, it is moved along rail foot behind sleeper, and rail-sleeper grid is fixed in initial position.
EFFECT: increased efficiency and quality of repair works.
3 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
UNIT FOR SINGLE REPLACEMENT OF SLEEPERS | 2018 |
|
RU2696542C1 |
REINFORCED CONCRETE SLEEPER | 2013 |
|
RU2536433C2 |
DEVICE FOR SECURING A RAIL TO A SLEEPER | 1992 |
|
RU2038440C1 |
APPARATUS FOR DISMANTLING TRACK SECTION | 0 |
|
SU840222A1 |
METHOD OF SEPARATE LONG-TERM STORAGE OF RAIL-AND-SLEEPER GRID ELEMENTS OF RAILROAD ON WOODEN SLEEPERS | 2019 |
|
RU2715318C1 |
PRODUCTION LINE FOR REPAIR OF ASSEMBLED RAIL AND SLEEPER LINKS | 2010 |
|
RU2443825C1 |
METHOD OF HIGH-QUALITY ASSEMBLY OF RAILWAY RAIL-AND-SLEEPER SECTION | 2004 |
|
RU2334039C2 |
ARRANGEMENT FOR REPLACING SLEEPERS IN ASSEMBLED TRACK LENGTHS | 0 |
|
SU587204A1 |
ANCHOR RAIL FASTENING | 2002 |
|
RU2228980C2 |
INTERMEDIATE SEPARATE RAIL FASTENING | 2001 |
|
RU2200783C2 |
Authors
Dates
2010-06-10—Published
2004-03-22—Filed