FIELD: transport.
SUBSTANCE: sleeper manipulator is arranged at the beginning of processing line to receive the package of new sleepers, disband said package and place sleepers, piece by piece, on the trolley that makes an aid of link assembling. Besides, final zone of processing line is provided with buncher of old-suitable sleepers for link assembling jobs.
EFFECT: higher efficiency.
2 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
PRODUCTION LINE FOR REPAIR OF LINKS OF THE TRACK AND SLEEPER GRID OF THE RAILWAY | 2010 |
|
RU2441960C1 |
CONTINUOUS LINE FOR REPAIR OF TRACK SKELETON LINKS | 2001 |
|
RU2210654C2 |
FLOW LINE FOR ASSEMBLING RAILWAY TRACK SECTIONS | 2004 |
|
RU2260089C1 |
PRODUCTION ASSEMBLY LINE OF LINKS OF TRACK SKELETON OF RAILROAD | 2010 |
|
RU2436886C1 |
FLOW LINE FOR ASSEMBLING SECTIONS OF TRACK SKELETONS | 2005 |
|
RU2298608C1 |
RAIL LENGTH ASSEMBLY LINE | 2008 |
|
RU2377357C1 |
PRODUCTION LINE FOR RAILROAD LENGTH ASSEMBLAGE | 2005 |
|
RU2304190C1 |
PRODUCTION LINE FOR ASSEMBLY OF RAIL LENGTHS | 1993 |
|
RU2063493C1 |
LINK-ASSEMBLING LINE | 2011 |
|
RU2498000C2 |
DEVICE FOR LAYING RAILS ON TIE BASEPLATES, MAINLY FOR SECTION ASSEMBLING LINES | 2006 |
|
RU2307886C1 |
Authors
Dates
2012-02-27—Published
2010-08-25—Filed