FIELD: mining.
SUBSTANCE: floating structure is composed of two serially manufactured bodies of metal moorages for large military ships equipped with serial devices. The bodies are connected above the water level with a bridge. Mounted on the floating structure are a serial drilling facility MBK-125, a drilling fluid circulation system, a power plant, a positioning system. The structure is brought to the drilling place, dropped onto the ground accepting water ballast and fixed with the help of pile devices. One performs well drilling; after its completion the structure is lifted and transported to another place.
EFFECT: possibility to develop deposits at depths specified (1,1-1,3 m).
2 dwg
Title | Year | Author | Number |
---|---|---|---|
MARINE ICE-RESISTANT ADJUSTABLE PLATFORM MOUNTING SYSTEM AND METHOD FOR PLATFORM TRANSPORTATION AND MOUNTING BY MEANS OF MOUNTING SYSTEM | 2005 |
|
RU2309221C2 |
ICE-RESISTANT DRILLING FACILITIES FOR DEVELOPMENT OF SHALLOW MARINE CONTINENTAL SHELF, AND FORMATION METHOD OF ICE-RESISTANT DRILLING FACILITIES FOR DEVELOPMENT OF SHALLOW MARINE CONTINENTAL SHELF | 2011 |
|
RU2478057C2 |
MARINE DRILLING COMPLEX | 2005 |
|
RU2283259C1 |
FLOATING FACILITY FOR DRILLING WELLS FROM SUPPORT UNITS | 2008 |
|
RU2392380C1 |
SEMI-SUBMERSIBLE MULTIPURPOSE MARINE COMPLEX | 2021 |
|
RU2757512C1 |
ICE-RESISTANT SELF-LIFTING PLATFORM FOR FREEZING SHALLOW WATER AND METHOD OF ITS INSTALLATION | 2011 |
|
RU2499098C2 |
ICE-RESISTANT OFFSHORE PLATFORM FOR SEISMIC REGIONS | 1999 |
|
RU2169231C1 |
METHOD FOR ADVANCE DRILLING OF PILOT SHAFTS DURING CONSTRUCTION OF WELLS ON SHELF | 2023 |
|
RU2818392C1 |
ICE RESISTANT DRILLING COMPLEX FOR SHALLOW CONTINENTAL SHELF DEVELOPMENT | 2008 |
|
RU2382849C1 |
ICE-RESISTANT OFFSHORE PLATFORM AND METHOD OF ITS OPERATION | 2001 |
|
RU2221917C2 |
Authors
Dates
2010-06-20—Published
2008-06-16—Filed