PROCEDURE FOR OPERATION OF HIGH WATER FLOODED OIL WELL Russian patent published in 2010 - IPC E21B43/00 

Abstract RU 2394153 C1

FIELD: oil and gas production.

SUBSTANCE: according to the procedure oil is withdrawn separately from pay to day surface. Preliminary, production in the well is gravitationally separated into oil and water. Separated water is pumped into a take-up bed. A pump is positioned above a packer on a pipe string, the pump is communicated through its input with under-packer space, while with its output it is communicated with above-packer space through radial apertures in the pipe string. Pipes of smaller diametre are arranged on the condition of gravitational separation of production into oil and water and are installed under radial apertures. Separated oil is lifted through tube space and the pipe string; its consumption is controlled at a wellhead; while controlled volume of water is pumped via tube space into the take-up bed due to pressure of liquid column in the well and excess pressure created with the pump. Interval of the take-up bed is communicated with wellhead measuring instrumentation via a separate tube; on base of instrumentation indications quality of water pumped into the take-up bed is controlled. Separation of emulsion into oil and water can be performed with a separator before pumping into tube space.

EFFECT: raised efficiency of operation due to withdrawing oil with minimal presence of water and to pumping major part of water into incumbent take-up bed, also due to control over amount and quality of water.

2 cl, 2 dwg

Similar patents RU2394153C1

Title Year Author Number
WATER OIL WELL OPERATION PLANT 2009
  • Basos Georgij Jur'Evich
  • Valovskij Vladimir Mikhajlovich
  • Valovskij Konstantin Vladimirovich
  • Garifov Kamil' Mansurovich
RU2395672C1
WELL STRUCTURE AND METHOD OF MULTIPAY OIL POOL DEVELOPMENT 2007
  • Gorodnov Vladimir Pavlovich
  • Gorodnov Konstantin Vladimirovich
RU2344272C2
METHOD FOR INTER-WELL FLUID PUMPING 2012
  • Rakhmanov Ajrat Rafkatovich
  • Akhmadiev Ravil' Nurovich
  • Kalimullin Rustam Talgatovich
  • Valovskij Konstantin Vladimirovich
  • Basos Georgij Jur'Evich
  • Valovskij Vladimir Mikhajlovich
RU2503805C1
SYSTEM AND METHOD OF OPERATION OF OIL FIELD AREAS WITH HIGH WATERCUT 2013
  • Smykov Viktor Vasilevich
  • Saetgaraev Rustem Khalitovich
  • Ryzhikov Aleksandr Ivanovich
  • Fazullin Ilgiz Dufakovich
  • Gazizov Ruslan Rustamovich
RU2549660C1
METHOD OF OPERATING FLOODED WELLS AND SYSTEM THEREFOR 2015
  • Kashapov Ildar Khamitovich
  • Zvezdin Evgenij Jurevich
  • Andaeva Ekaterina Alekseevna
  • Kamaleev Ildar Shagitovich
RU2601685C1
UNIT BOREHOLE ROD PUMPING WITH DOUBLE-ACTING PUMP 2007
  • Basos Georgij Jur'Evich
  • Valovskij Vladimir Mikhajlovich
  • Valovskij Konstantin Vladimirovich
  • Ibragimov Nail' Gabdulbarievich
  • Fadeev Vladimir Gelievich
  • Akhmetvaliev Ramil' Nafisovich
RU2364708C1
OIL DEPOSIT DEVELOPMENT METHOD 2014
  • Khisamov Rais Salikhovich
  • Akhmetgareev Vadim Valer'Evich
  • Gazizov Ilgam Garifzjanovich
RU2540714C1
DEVICE FOR SIMULTANEOUS SEPARATE EXTRACTION OF WELL PRODUCT AND FOR FORCING WATER INTO FORMATION 2006
  • Ibragimov Nail' Gabdulbarievich
  • Taziev Mirgazijan Zakievich
  • Zakirov Ajrat Fikusovich
  • Rakhmanov Ajrat Rafkatovich
  • Ozheredov Evgenij Vital'Evich
  • Dzhafarov Mirzakhan Atakishi Ogly
RU2297521C1
PUMPING ROD BOREHOLE PLANT WITH DOUBLE-ACTING PUMP 2012
  • Basos Georgij Jur'Evich
  • Valovskij Konstantin Vladimirovich
  • Valovskij Vladimir Mikhajlovich
  • Ryzhikov Aleksandr Ivanovich
  • Saetgaraev Rustem Khalitovich
RU2483228C1
DEVELOPMENT METHOD OF MULTIPLE-ZONE OIL DEPOSIT 2014
  • Khisamov Rais Salikhovich
  • Akhmetgareev Vadim Valer'Evich
  • Gazizov Ilgam Garifzjanovich
RU2540715C1

RU 2 394 153 C1

Authors

Basos Georgij Jur'Evich

Valovskij Vladimir Mikhajlovich

Valovskij Konstantin Vladimirovich

Garifov Kamil' Mansurovich

Dates

2010-07-10Published

2009-06-09Filed