FIELD: oil and gas industry.
SUBSTANCE: method includes packer installation above the production well bed, oil-water emulsion extraction from below-packer space by pump, descended at tube string, emulsion separation to oil and water in down-hole conditions, oil extraction from top part of above-packer annular space to oil pipeline, extraction of formation water and its pumping via water pipeline through injection wells into oil bed with undeveloped oil resources. Pump operation is provided in constant mode, oil-water emulsion is supplied through radial holes in tube string into above-packer annular space, where oil-water emulsion is separated. Water is extracted from above-packer annular space via subsidiary tube, the inlet of which is located below the level of water-oil contact, and its outlet is connected to the water pipeline fitted with flow metre. Oil extraction is additionally performed from tube string into oil pipeline, which is fitted with flow regulator and is connected to the subsidiary tube via bypass line, connected to the oil pipeline after flow regulator for water discharging into it at water pipeline repair works.
EFFECT: extension of scope of application due to the use of former production wells as well as actual watered production wells as water supply wells; efficiency increase due to elimination of pump station stops for pump station switching to oil displacement mode and for the time of water pipeline repair works.
1 ex, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR INTER-WELL TRANSIT OF LIQUID | 2005 |
|
RU2290500C1 |
WELL OPERATION METHOD | 2012 |
|
RU2490436C1 |
DEVELOPMENT METHOD OF OIL DEPOSIT BY WATER-FLOODING | 2012 |
|
RU2494237C1 |
PROCEDURE FOR OPERATION OF HIGH WATER FLOODED OIL WELL | 2009 |
|
RU2394153C1 |
METHOD OF INJECTION OF WATER IN THE SYSTEM OF SUPPORTING THE RESERVOIR PRESSURE IN WEAKLY PERMEABLE HEADERS | 2018 |
|
RU2676780C1 |
PLANT FOR IN-WELL SEPARATION OF OIL FROM WATER | 2012 |
|
RU2531976C2 |
WELL SEPARATOR | 2005 |
|
RU2291291C1 |
WELL DEVICE FOR SEPARATION OF OIL AND WATER | 2005 |
|
RU2290505C1 |
PROCEDURE FOR DEVELOPMENT OF WATERED OIL DEPOSIT | 2009 |
|
RU2401937C1 |
OPERATING METHOD OF WATER-FLOODED OIL FORMATION | 2020 |
|
RU2724715C1 |
Authors
Dates
2014-01-10—Published
2012-07-27—Filed