FIELD: transport.
SUBSTANCE: invention relates to load handling equipment and can be used in designing machine intended for reloading of heat-generating assemblies I nuclear reactor. Crane bridge comprises longitudinal and end girders with intersecting lengthwise axes. Girders are jointed together by flanges with centering elements arranged at girders joint points. Girders joints are furnished with locking cotter pins each being fitted in grooves of flanges arranged on joint side. Centering elements are arranged at intersection of longitudinal and end girder lengthwise axes.
EFFECT: reduced power-to-weight ratio, higher accuracy of assembly.
7 dwg
Title | Year | Author | Number |
---|---|---|---|
ASSEMBLY STAND OF ITEM FAIRING, UPPER FOUNDATION OF STAND, LOWER FOUNDATION OF STAND, MECHANISM OF ITEM FAIRING ASSEMBLY STAND TURNING, HOISTING MECHANISM FOR ITEM FAIRING ASSEMBLY STAND, SUPPORT CARRIAGE FOR ITEM FAIRING ASSEMBLY STAND, PROCEDURE FOR FAIRING ASSEMBLY ON STAND | 2008 |
|
RU2392201C1 |
HYBRID BRIDGE SPAN | 2022 |
|
RU2794115C1 |
UNIT FOR MATING CRANE BRIDGE SPAN AND END BEAMS | 0 |
|
SU1822858A1 |
0 |
|
SU393194A1 | |
MIDDLE SECTION OF BRIDGE AIMING BEAM OF MECHANIZED COMPLEX | 2020 |
|
RU2743553C1 |
CRANE BRIDGE | 2006 |
|
RU2324641C1 |
TRAVELING CRANE TRACK | 0 |
|
SU1392019A1 |
METHOD FOR DOCKING OF RIVER PARTS OF FLOATING BRIDGES MLZH-VF-VT AND NZHM-56 | 2018 |
|
RU2692363C1 |
0 |
|
SU170157A1 | |
METHOD FOR COMPOSITE REINFORCED CONCRETE BRIDGE SPAN STRUCTURE CONSTRUCTION AND COMPOSITE REINFORCED CONCRETE MEMBER FOR SPAN STRUCTURE CONSTRUCTION | 2005 |
|
RU2279503C1 |
Authors
Dates
2010-08-27—Published
2009-06-02—Filed