FIELD: metallurgy.
SUBSTANCE: procedure consists in metal arc heating, in melt inert-gas flashing through porous bottom tuyeres and in treatment of metal with slag in furnace-ladle aggregate and in vacuumiser. Metal is arc-heated in the furnace-ladle aggregate to temperature 1585-1610°C and is flashed with combined nitrogen and argon through porous bottom tuyeres. When common amount of introduced nitrogen reaches 0.30 m3/t of liquid steel, flashing is switched to argon. Flashing with argon is carried out at rate 3-30 m3/h; further metal is deoxidised with silica-calcium at consumption rate of 110-150 g of calcium per ton of liquid steel and is vacuumised when steel is flashed in the ladle with nitrogen through porous bottom tuyeres at rate of consumption 4-36 m3/h during 8-65 min under vacuum and at pressure less, than 34 MPa. Steel is subjected to combined flashing with nitrogen at consumption rate 3-50 m3/h to concentration of nitrogen in steel not more, than 25 ppm and successive flushing with argon to temperature 1520-1545°C.
EFFECT: reduced prime cost of melted steel, upgraded physical-mechanical properties of steel due to reduced impurity with non-metallic inclusions, also reduced consumption of nitrated and calcium containing ferroalloys.
Title | Year | Author | Number |
---|---|---|---|
PROCEDURE FOR REFINING RAIL STEEL IN LADLE-FURNACE | 2010 |
|
RU2425154C1 |
METHOD FOR PRODUCTION OF NITROGEN-DOPED STEEL IN BUCKET | 2020 |
|
RU2754337C1 |
PROCEDURE FOR PRODUCTION OF RAIL STEEL | 2009 |
|
RU2415180C1 |
PROCEDURE FOR MELTING AND DEGASSING RAIL STEEL | 2008 |
|
RU2394918C2 |
METHOD OF REFINING OF STEEL IN LADLE-FURNACE | 2008 |
|
RU2365631C1 |
METHOD OF REFINING RAIL STEEL IN FURNACE-LADLE | 2006 |
|
RU2312902C1 |
METHOD OF PRODUCTION OF RAIL STEEL | 2003 |
|
RU2254380C1 |
METHOD OF MAKING STEEL FOR ROUND BILLET | 2005 |
|
RU2284359C1 |
NITRIDING METHOD OF STEEL | 2008 |
|
RU2380431C1 |
METHOD OF RAIL IRON MELTING | 2006 |
|
RU2325447C1 |
Authors
Dates
2010-09-10—Published
2009-04-28—Filed