FIELD: gas-and-oil industry.
SUBSTANCE: water is pumped through pressure wells, and product is withdrawn via producers. There are performed primary tracer examinations for revealing filtering channels connecting pressure wells with producers. Further, they are backfilled with insulating material. Water pumping into pressure wells is resumed. Notably, a tracer agent different from the tracer agent used for primary tracer examinations is additionally introduced into compatible flow deflecting compositions and solutions of chemical reagents forming insulating material. Direction of inflow of flow deflecting compositions and solutions of chemical reagents, efficiency of their effect to a reservoir and stability of insulating material in time are determined by results of control over composition of extracted production from producers and over contents of tracer elements in it.
EFFECT: increased efficiency of operations for oil output of reservoir at development of oil deposits.
2 cl
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR GEOCHEMICAL MONITORING OF WELL PERFORMANCE EVALUATION AFTER APPLICATION OF CHEMICAL METHODS FOR ENHANCED OIL RECOVERY | 2022 |
|
RU2799218C1 |
METHOD OF DEVELOPMENT OF OIL DEPOSITS | 2008 |
|
RU2383722C2 |
METHOD FOR OIL DEPOSIT DEVELOPMENT | 2021 |
|
RU2777820C1 |
METHOD OF INCREASING OIL RECOVERY OF FORMATIONS | 2020 |
|
RU2735821C1 |
OIL DEPOSIT DEVELOPMENT METHOD | 2019 |
|
RU2716316C1 |
USING TITANIUM COAGULANT FOR TREATMENT OF WATER-FLOODED OIL RESERVOIR | 2015 |
|
RU2581070C1 |
METHOD FOR MULTIPAY FIELD SURVEY AND DEVELOPMENT | 2005 |
|
RU2315863C2 |
COMPOSITION OF REAGENT FOR DEVELOPMENT OF OIL FIELD BY FLOODING AND METHOD OF ITS APPLICATION | 2018 |
|
RU2693104C1 |
METHOD OF TREATMENT OF NONUNIFORM OIL-GAS FORMATIONS | 2001 |
|
RU2208136C2 |
METHOD OF OIL FIELD DEVELOPMENT | 2016 |
|
RU2648135C1 |
Authors
Dates
2010-09-10—Published
2009-01-11—Filed