FIELD: power industry.
SUBSTANCE: to reactor control scheme there introduced is calculating unit of stabilising signal-gradient of effective heat carrier temperature, the output of which is connected to additional third input of summing amplifier. As a result of the scheme change, there reached is minimisation of heat carrier leakages between circuit 1 and gas compensation system in unsteady and quasi-static conditions, which allows avoiding thermal cyclic action on the equipment.
EFFECT: improving reactor equipment reliability.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
NUCLEAR REACTOR PARAMETRE CONTROL METHOD | 2009 |
|
RU2413315C2 |
METHOD AND DEVICE FOR AUTOMATIC CONTROL OF NUCLEAR REACTOR POWER | 2003 |
|
RU2244350C2 |
METHOD FOR CONTROLLING POWER INSTALLATION WARM-UP DUTY | 2000 |
|
RU2190266C2 |
POWER PLANT AUTOMATIC CONTROL SYSTEM | 2007 |
|
RU2360137C1 |
UNDERWATER NUCLEAR THERMOELECTRIC PLANT | 2014 |
|
RU2568433C1 |
METHOD AND SYSTEM FOR CONTROL OVER ROCKET | 2012 |
|
RU2527391C2 |
HOMOGENEOUS FAST REACTOR REACTIVITY CONTROL PROCESS | 1999 |
|
RU2157006C1 |
MULTICHANNEL CONTROL DEVICE | 0 |
|
SU1529174A1 |
ALTERNATING VOLTAGE STABILIZING FILTER | 1995 |
|
RU2094935C1 |
Authors
Dates
2010-09-20—Published
2009-01-11—Filed