FIELD: mining.
SUBSTANCE: tube-like deposit is divided into separate layers, which are horizontal or inclined towards well head, besides, well is drilled in the first layer after removal of overburden with subgrade drilling for depth of pilot well, and in subsequent layers - after full development of previous layer. At the same time mineral is supplied by self-propelled mining machine into head of drilled well, which, as pillar is rotated, is delivered by auger conveyor into loading windows above pilot bit, and is taken to surface through inner channels of pillar.
EFFECT: separation of drilling process and process of mineral delivery to surface in time in order to optimise parametres of drilling mode and operation of auger feeder as independent processes of mining.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF OPENCAST MINING OF MINERAL DEPOSITS | 1994 |
|
RU2090754C1 |
DEVELOPMENT METHOD OF MINERAL DEPOSITS BY DRILLING OF LARGE-DIAMETER CORE | 2010 |
|
RU2461712C2 |
OPEN DEVELOPMENT METHOD OF MINERAL RESOURCES DEPOSITS | 2011 |
|
RU2465461C2 |
METHOD FOR PRODUCTION OF DIAMONDS IN PERMAFROST KIMBERLITIC DEPOSITS | 2010 |
|
RU2457329C2 |
HYDRAULIC BORE MINING OF MINERALS | 2016 |
|
RU2640611C2 |
METHOD OF BORE-HOLE HYDRAULIC MINING OF MINERALS | 1995 |
|
RU2081325C1 |
METHOD FOR EXPLORATION, TEST MINING AND EXPLOITATION OF MINERAL RESOURCES AND A SYSTEM TO IMPLEMENT THE SAME | 1994 |
|
RU2068960C1 |
METHOD TO MINE MINERAL DEPOSITS | 2010 |
|
RU2443864C1 |
METHOD OF MINING MINERAL DEPOSITS AND SUPERSTRUCTURE FOR ITS EMBODIMENT | 1994 |
|
RU2078209C1 |
PLANT TO EXTRACT HARD ORE FROM THIN BEDS BY DRILLING-OUT | 2012 |
|
RU2486339C1 |
Authors
Dates
2011-02-20—Published
2009-01-11—Filed