FIELD: mining.
SUBSTANCE: proposed plant comprises machine to drill pilot well arranged in drilling room, rock cutting tool, screw to displace sludge, winch with rope and mounting trolley. Besides, it comprises equipment to reception and transfer of sludge. Note here that said winch is arranged at said mounting trolley and located in transport-sorting face. Note also that screw and cable are secured to expander on the side opposite the pilot well mouth.
EFFECT: expanded operating performances and higher efficiency.
5 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF CONSTRUCTION OF WELLS WITH LARGE DIAMETER | 2019 |
|
RU2709863C1 |
METHOD OF DRIVING OF MINE WORKINGS IN MINING OF THIN DEPOSITS OF HARD ORES BY SHEARER UNDER CONDITIONS OF HIGH ROCK PRESSURE | 2001 |
|
RU2179243C1 |
METHOD OF MINING OF HARD ORES FROM THIN DEPOSITS BY DRILLING-OUT | 2000 |
|
RU2168625C1 |
METHOD OF MINING THIN GENTLY-SLOPING DEPOSITS | 0 |
|
SU1535994A1 |
DRILL-AND-DRIFT METHOD FOR UNDERGROUND MINING OF COAL SEAMS | 1995 |
|
RU2096618C1 |
APPARATUS FOR DRILLING ASCENDING MINE WORKINGS | 0 |
|
SU1162982A1 |
METHOD FOR DRILLING OF PROCESS EQUIPMENT ELEMENTS IN WELL | 2019 |
|
RU2703013C1 |
DEVELOPMENT METHOD OF TUBE-LIKE AND THICK ORE BODIES | 2010 |
|
RU2444625C1 |
WELL EXPANDER | 2003 |
|
RU2244796C1 |
UNDERGROUND DEVELOPMENT METHOD OF THICK MINERAL DEPOSITS | 2010 |
|
RU2448249C2 |
Authors
Dates
2013-06-27—Published
2012-02-08—Filed