FIELD: oil and gas industry.
SUBSTANCE: method for preventing sand production and reducing water influx to the well with low formation temperature involves warming-up of bottom-hole zone of formation and pumping to bottom-hole zone of formation of saturated water solution of mineral salt, which is heated to temperature of not less than 90°C; mineral salt has solubility difference of more than 700 g/l in temperature range of 20°C to 90°C. Prior to saturated water solution of mineral water there pumped to the well is quartz sand with fraction size of 0.05 to 2 mm in natural bitumen heated to 60°C and having viscosity at this temperature of not less than 60 mPa·s.
EFFECT: improving efficiency of works on strengthening of bottom-hole zone and restriction of water influx owing to increasing the depth of penetration to the formation of compound for fixing the bottom-hole zone and reducing the duration of works.
2 cl, 1 ex
| Title | Year | Author | Number |
|---|---|---|---|
| METHOD FOR REINFORCEMENT OF BOTTOM-HOLE ZONE AND PREVENTION OF SAND CARRYOVER FROM WELL | 2011 |
|
RU2485284C1 |
| PROCEDURE FOR INSULATING ZONES OF WATER PRODUCTION IN WELL | 2008 |
|
RU2370631C1 |
| METHOD FOR INSULATION OF WATER PRODUCTIONS AND THIEF ZONES IN WELL | 2009 |
|
RU2392418C1 |
| METHOD OF BOTTOMHOLE SUPPORT IN WELLS | 2009 |
|
RU2387803C1 |
| METHOD OF CONSOLIDATING SAND-SHOWING FORMATION IN WELL | 0 |
|
SU1633091A1 |
| METHOD FOR LIMITING SAND PRODUCTION IN PRODUCTION WELLS | 2022 |
|
RU2784877C1 |
| COMPOSITION FOR WATER INSULATION IN GAS-BEARING SEAM | 2009 |
|
RU2383576C1 |
| BACKFILL COMPOSITION FOR REMEDIAL CEMENTING | 2008 |
|
RU2386658C1 |
| METHOD OF STABILIZATION OF BOTTOM-HOLE PRODUCING FORMATION ZONES | 1999 |
|
RU2172811C2 |
| ISOLATION METHOD OF WATER INFLUX ZONES IN WELL | 2012 |
|
RU2494229C1 |
Authors
Dates
2011-02-27—Published
2009-11-26—Filed