FIELD: mining.
SUBSTANCE: in method to form lane in winter period, including laying of heat insulation material onto water surface in the form of balls arranged as hollow with rigid plastic or silicon shell, besides, required quantity of balls per 1 m2 of water surface is determined using mathematical formula.
EFFECT: reduced environmental damage done to ambient water medium and prolongation of production season in winter period.
1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD TO CREATE ICE HOLE IN WINTER PERIOD | 2012 |
|
RU2493321C1 |
DEVICE FOR PROTECTING LANE CREEPERS AND DREDGERS FROM FREEZING | 2009 |
|
RU2421571C1 |
DEVICE FOR PROTECTING LANE OF DREDGES AND DREDGE SHIPS AGAINST FREEZING | 2010 |
|
RU2424399C1 |
METHOD OF LANE FORMATION IN ICE COVER OF WATER BASIN | 0 |
|
SU1709013A1 |
METHOD FOR EXTRACTING GRAVEL DEPOSITS UNDER REACHES OF RIVERS, LOCATED IN PERMAFROST ZONES | 2005 |
|
RU2299328C2 |
PROCESS OF DEVELOPMENT OF FROZEN GROUND BY SUCTION-TUBE DREDGE | 2001 |
|
RU2204658C2 |
METHOD OF COMBINATION DEVELOPMENT OF PERMAFROST SLIMES IN ACTIVE PIT | 2011 |
|
RU2486341C2 |
METHOD FOR GROUND WASHING IN | 2004 |
|
RU2270340C2 |
WATER SUPPLY FOR DREDGING | 2012 |
|
RU2524828C2 |
METHOD AND APPARATUS FOR WORKING SOIL BY DREDGE IN WINTERTIME | 0 |
|
SU987045A1 |
Authors
Dates
2011-03-20—Published
2009-11-11—Filed