FIELD: oil and gas production.
SUBSTANCE: procedure consists in drilling pressure and producing wells. Upon pumping plugging-back solution below water-oil contact oil is withdrawn above the level of oil-water contact through producers on tops of dome-shaped highs. Following treatment with chemical reagents working substance is pumped via pressure wells hydro-dynamically communicated with the given wells within the boundaries of the given payout bed. Below oil-water contact plugging-back solution in form of hydrophilic polymer is additionally pumped through the pressure wells and producers simultaneously. Working substance is pumped into the pressure wells above water-oil contact. Chemical reagents are pumped into producers above water-oil contact cyclically in form of gas or gaseous fluid.
EFFECT: decreased oil watering due to reduced volume of water ingress to bottomhole; raised yield of reservoir without additional exposure of producer above packer.
4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DEVELOPMENT OF OIL DEPOSIT | 2011 |
|
RU2463443C1 |
METHOD OF OIL-POOL DEVELOPMENT | 2006 |
|
RU2330943C2 |
METHOD FOR OIL PRODUCTION | 2006 |
|
RU2315861C1 |
METHOD OF OIL-POOL DEVELOPMENT | 2006 |
|
RU2330945C2 |
DEVELOPMENT METHOD OF WATER-OIL RESERVOIR | 2020 |
|
RU2732742C1 |
METHOD FOR DEVELOPMENT OF OIL FORMATION | 1994 |
|
RU2090742C1 |
METHOD FOR DEVELOPMENT OF DEPOSIT COMPLICATED BY VERTICAL INTERRUPTIONS | 2015 |
|
RU2595105C1 |
METHOD FOR DEVELOPMENT OF FORMATION WITH BOTTOM WATER | 2020 |
|
RU2738146C1 |
METHOD OF OIL POOL DEVELOPMENT AT LATE STAGE | 2000 |
|
RU2178517C2 |
DEVELOPMENT METHOD OF OIL DEPOSIT WITH OIL-WATER ZONES | 2010 |
|
RU2443853C1 |
Authors
Dates
2011-05-20—Published
2010-04-16—Filed