FIELD: oil, gas and coke-chemical industries.
SUBSTANCE: invention relates to oil and gas industry and can be used to increase hydrocarbon extraction from formation with bottom water when it is displaced by water. Method of formation production with bottom water includes construction of pressure and horizontal production wells, conducting horizontal shafts, first of which is near oil-water contact, and second - in upper part of oil-saturated formation, pumping working agent through injection wells, extraction of formation products through production wells. First horizontal borehole is constructed from a pressure well with perforation for delivery directed downwards, and the second horizontal bore of a production well is equipped with perforated holes directed upward. Volume of product extraction from production wells is maintained at level of 80–90 % of pumping volume in injection wells.
EFFECT: technical result consists in simplification of construction and implementation due to construction of horizontal shafts from different wells, provision of absence of reagent injection for formation of water-insulating screen and reduction of water content of product, constant operation of all horizontal shafts and implementation of waterproofing due to hydrodynamic distribution of flows, resulting in saving material and technical resources.
4 cl
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR ISOLATING WATER INFLOW IN A FORMATION WITH BOTTOM WATER | 2021 |
|
RU2775120C1 |
METHOD OF DEVELOPING OIL DEPOSIT DEVELOPMENT, WITH UNDERLYING WATER | 2015 |
|
RU2592920C1 |
OPERATING METHOD OF WATER-FLOODED OIL FORMATION | 2020 |
|
RU2724715C1 |
METHOD FOR EXPLOITATION OF A DEPOSIT WITH POROUS-CAVERNOUS-FRACTURED RESERVOIR BY HORIZONTAL WELLS | 2022 |
|
RU2776552C1 |
METHOD OF DEVELOPING OIL DEPOSITS IN FRACTURED RESERVOIRS WITH WATER OIL ZONES | 2015 |
|
RU2578134C1 |
DEVELOPMENT OF INHOMOGENEOUS DEPOSIT BY INCLINED AND HORIZONTAL WELLS | 2013 |
|
RU2524800C1 |
OIL DEPOSIT DEVELOPMENT METHOD | 2005 |
|
RU2285789C1 |
OIL DEPOSIT DEVELOPMENT METHOD | 2019 |
|
RU2715114C1 |
METHOD FOR DEVELOPMENT OF HIGH-VISCOSITY OIL AND/OR BITUMEN DEPOSITS WITH OIL-WATER ZONES | 2012 |
|
RU2522369C1 |
METHOD TO DEVELOP OIL FORMATION | 2008 |
|
RU2378502C1 |
Authors
Dates
2020-12-08—Published
2020-04-30—Filed