PROCEDURE AND DEVICE FOR TRANSFER OR RECEPTION OF INFORMATION BETWEEN DOWNHOLE EQUIPMENT AND SURFACE Russian patent published in 2011 - IPC G01V3/30 E21B47/12 

Abstract RU 2419820 C2

FIELD: oil and gas production.

SUBSTANCE: well is equipped with casing string communicated with geological formation. The essence of the invention is like follows: first converter (14) is set in the first location. The first converter consists of two electrodes corresponding to first (141) and second (142) lower electrodes. The first and the second lower electrodes are in electrical contact with the casing string. Second converter (15) is set in the said second location. The second converter consists of two electrodes corresponding to first (151) and second (152) higher electrodes. The first or the second converters emit an electric signal applying it between corresponding electrodes. The second or the first converter receive the electric signal recording it with corresponding electrodes.

EFFECT: independence from geometric characteristics of well and fluid impedance, production string, casing string and formation.

21 cl, 13 dwg

Similar patents RU2419820C2

Title Year Author Number
METHOD FOR HIGH-PRESSURE TRIP GAS USAGE IN GAS-LIFT WELL 2001
  • Khersh Dzhon Mishel'
  • Stedzhemejer Dzhordzh Leo
  • Kholl Dzhejms Vill'Jam
  • Vajngar Kharold Dzh.
  • Bernett Robert Reks
  • Sevedzh Vill'Jam Mauntdzhoj
  • Karl Frederik Gordon Ml.
RU2263202C2
OIL WELL, METHOD FOR OIL EXTRACTION FROM THE WELL AND METHOD FOR CONTROLLABLE FLUID INJECTION INTO FORMATION THROUGH THE WELL 2001
  • Stedzhemejer Dzhordzh Leo
  • Vajngar Kharold Dzh.
  • Bernett Robert Reks
  • Sevedzh Vill'Jam Mauntdzhoj
  • Karl Frederik Gordon Ml.
  • Khersh Dzhon Mishel'
RU2258799C2
OIL WELL (VARIANTS), METHOD OF OIL WELL OPERATION, DOWNHOLE DEVICE SUPPLY SYSTEM AND METHOD 2001
  • Khersh Dzhon Mishel'
  • Vajngar Kharold Dzh
  • Bernett Robert Reks
  • Sevedzh Vill'Jam Mauntdzhoj
  • Karl Frederik Gordon Ml
RU2258800C2
METHODS, DEVICE AND SYSTEMS FOR RECEIVING OF INFORMATION ABOUT GEOLOGICAL FORMATION BY MEANS OF SENSORS, INSTALLED ON CASING PIPE IN BOREHOLE 2004
  • Salamitu Filipp
  • Zhjund Zhak
  • Bejli Robert
RU2359120C2
OIL WELL, OIL WELL OPERATION METHOD AND PACKER USED IN THE WELL 2001
  • Vajngar Kharold Dzh.
  • Bernett Robert Reks
  • Sevedzh Vill'Jam Mauntdzhoj
  • Karl Frederik Gordon Ml.
  • Khersh Dzhon Mishel'
RU2262597C2
SYSTEM FOR CONTROLLING CONNECTIONS AND FEEDING OF ELECTRIC CURRENT, OIL WELL FOR EXTRACTING OIL PRODUCTS (VARIANTS) AND METHOD FOR EXTRACTING OIL PRODUCT FROM OIL WELL 2001
  • Vajngar Kharold Dzh.
  • Khaas Mark Kristofer
RU2256074C2
SYSTEM FOR CHEMICAL INJECTION INTO WELL, OIL WELL FOR OIL PRODUCT EXTRACTION (VARIANTS) AND OIL WELL OPERATION METHOD 2001
  • Stedzhemejer Dzhordzh Leo
  • Vajngar Kharold Dzh.
  • Bernett Robert Reks
  • Sevedzh Vill'Jam Mauntdzhoj
  • Karl Frederik Gordon Ml
  • Khersh Dzhon Mishel'
RU2258805C2
CONTINUOUS DOWNHOLE RESONANCE SOURCE 2004
  • Aronstam Piter S.
RU2330309C2
DISLOCATION OF UNDERGROUND SENSORS IN CASING STRING 2005
  • Shuzenu Kristian
  • Klark Brajan
  • Manehn Iv
  • Droshon Brjuno
RU2374441C2
ENERGY TRANSMISSION MECHANISM FOR A CONNECTION JOINT FOR CONNECTION WITH A LATERAL WELL FINISHING TOOL 2017
  • Steele, David Joe
RU2745682C1

RU 2 419 820 C2

Authors

Lemenazhe Ehrvan

Luling Martin

Mat'E Iv

Shuzenu Kristian

Dates

2011-05-27Published

2006-07-28Filed