FIELD: construction.
SUBSTANCE: subsurface part of the beach is washed from the surface of a water reservoir onto a protective screen laid onto the bottom of the beach subsurface part. Then above-water coastal part of beach is filled. Sand hydraulic mixture is prepared in sump installed in technological trench joined to water reservoir and filled with water. Movement of floating pulp line on water surface of beach is carried out from coast by means of guide ropes. Technological trench is arranged as longitudinal through or dead-ended, or as transverse and dead-ended. Sump is arranged as movable or stationary. Floating pulp line is moved on water surface perpendicularly to coastal line or along semicircle. Device comprises hydraulic transport installation, distribution pulp line equipped with holes, protective screen arranged of tissue materials and sump equipped along perimetre with a safety net, and with a sieve on top. Pulp line is arranged as floating, has a coastal connection and is equipped with guide ropes. Protective screen is equipped with pioneer cantledges.
EFFECT: invention makes it possible to reduce costs and time of beach construction, and to increase their service lives.
12 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
TRANSPORT JUNCTION AND METHOD FOR CONSTRUCTION THEREOF | 2015 |
|
RU2587673C1 |
METHOD AND DEVICE FOR HYDRAULIC MIX FORMING DURING ROCK INTAKE WITH HYDRAULIC DREDGE | 2003 |
|
RU2323303C2 |
METHOD OF BURIAL OF WASTE WATER | 0 |
|
SU667079A1 |
METHOD OF HEAP LIXIVIATION | 1995 |
|
RU2095562C1 |
METHOD FOR PERFORMING MINING OPERATIONS UNDER LAKE | 2004 |
|
RU2257473C1 |
ROPE-SCRAPER UNIT | 0 |
|
SU1442657A1 |
DEVICE FOR PRODUCTION OF SAPROPEL OF NATURAL MOISTURE | 2010 |
|
RU2447234C1 |
GULLY TWO-STAGE SLURRY DUMP FOR GRANULAR INDUSTRIAL WASTE | 2004 |
|
RU2275458C1 |
METHOD FOR PROTECTING TERRITORY FROM FLOODING | 2000 |
|
RU2176700C1 |
METHOD OF ERECTING GROUND STRUCTURE | 0 |
|
SU1578261A1 |
Authors
Dates
2011-06-10—Published
2008-07-11—Filed