FIELD: construction.
SUBSTANCE: device comprises a boom, a bucket, the main hydraulic cylinder of the boom, a balancing pneumatic hydraulic cylinder, a gas balloon. The main hydraulic cylinder of the boom and the balancing pneumatic hydraulic cylinder are located in a single longitudinal vertical plane of the boom symmetry, so that the balancing pneumatic hydraulic cylinder is brought to the boom as close as possible in the lower and upper limit positions of the working equipment. The boom base is arranged in the form of a box, where the balancing pneumatic hydraulic cylinder is installed, a piston cavity of which is connected to a gas balloon charged with pressure of more than 10 MPa. At the same time the volume of the gas balloon makes more than five working volumes of the balancing pneumatic hydraulic cylinder.
EFFECT: energy-saving and simplification of design.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
ENERGY-EFFICIENT WORKING EQUIPMENT OF BOOM SINGLE-BUCKET MACHINE | 2009 |
|
RU2405893C1 |
ENERGY-SAVING OPERATING EQUIPMENT OF EXCAVATOR WITH ARTICULATED DIGGING ARM | 2009 |
|
RU2425928C1 |
ENERGY-SAVING WORKING EQUIPMENT OF SINGLE-BUCKET EXCAVATOR AT ROTARY COLUMN | 2009 |
|
RU2422593C1 |
ENERGY-SAVING DEVICE OF WORK EQUIPMENT OF BOOM MACHINE | 2014 |
|
RU2558073C1 |
BOOM MACHINE WORKING IMPLEMENT GRAVITY BALANCING DEVICE (VARIANTS) | 2005 |
|
RU2304668C1 |
POWER EFFICIENT WORKING EQUPMENT OF HYARAULIC EXCAVATOR FRONT SHOVEL | 2010 |
|
RU2428546C1 |
POWER SAVING DEVICE | 2014 |
|
RU2558545C1 |
METHOD OF COUNTERBALANCING OF FORCES OF GRAVITY OF WORKING EQUIPMENT OF JIB MACHINES AND DEVICE FOR ITS IMPLEMENTATION | 2013 |
|
RU2531117C1 |
METHOD OF PROTECTION OF EXCAVATOR FROM INFLUENCE OF HYDRAULIC HAMMER AND DEVICE TO THIS EFFECT | 2007 |
|
RU2343246C2 |
METHOD TO BALANCE POWERS OF GRAVITY OF WORKING EQUIPMENT OF BOOM MACHINES | 2013 |
|
RU2535846C1 |
Authors
Dates
2011-06-27—Published
2009-12-02—Filed