FIELD: machine building.
SUBSTANCE: power efficient working equipment consists of turning platform, of gantry, of boom, of stick, of bucket, of hydro-cylinders of boom lift. of hydro-cylinders of stick turn and of hydro-cylinder of bucket turn. In vertical plane of symmetry of the boom between hydro-cylinders of stick turn there is installed a pneumatic hydro-cylinder pivotally secured on the turning platform and the boom, a piston cavity of which is connected at least with two gas tanks charged with compressed air at pressure over 10 MPa. Total volume of gas tanks amounts to at least four working volumes of the pneumatic hydro-cylinder. At least one hydraulic damper of working fluid pressure charged with compressed air over 15 MPa is connected to piston cavities of the boom hydro-cylinders.
EFFECT: improved design of working equipment of hydraulic excavator, reduced fluctuations of pressure in hydro-system of working equipment.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
ENERGY-SAVING OPERATING EQUIPMENT OF EXCAVATOR WITH ARTICULATED DIGGING ARM | 2009 |
|
RU2425928C1 |
ENERGY-SAVING WORKING EQUIPMENT OF SINGLE-BUCKET EXCAVATOR AT ROTARY COLUMN | 2009 |
|
RU2422593C1 |
ENERGY-SAVING WORKING EQUIPMENT OF EXCAVATOR | 2009 |
|
RU2422595C1 |
ENERGY-EFFICIENT WORKING EQUIPMENT OF BOOM SINGLE-BUCKET MACHINE | 2009 |
|
RU2405893C1 |
ENERGY-SAVING DEVICE OF WORK EQUIPMENT OF BOOM MACHINE | 2014 |
|
RU2558073C1 |
POWER SAVING DEVICE | 2014 |
|
RU2558545C1 |
METHOD OF COUNTERBALANCING OF FORCES OF GRAVITY OF WORKING EQUIPMENT OF JIB MACHINES AND DEVICE FOR ITS IMPLEMENTATION | 2013 |
|
RU2531117C1 |
HYDRAULIC DRIVE OF WORKING EQUIPMENT OF POWER SHOVEL | 0 |
|
SU1134678A1 |
METHOD TO BALANCE POWERS OF GRAVITY OF WORKING EQUIPMENT OF BOOM MACHINES | 2013 |
|
RU2535846C1 |
BOOM MACHINE WORKING IMPLEMENT GRAVITY BALANCING DEVICE (VARIANTS) | 2005 |
|
RU2304668C1 |
Authors
Dates
2011-09-10—Published
2010-03-02—Filed