FIELD: oil and gas production.
SUBSTANCE: procedure consists in drilling producing and pressure boreholes, in pumping working substance through pressure boreholes and withdrawal of production through producing boreholes, in analysis for determination of prevailing direction of fracturing of the deposit and zones with minimal and average density of fracturing. Horizontal and/or branched boreholes are drilled additionally in zones with minimal and average density of fracturing with oil non-saturated thickness of reservoir as big, as 10 m. Horizontal bores are positioned in the reservoir at angle 50-70° to prevailing direction of deposit fracturing. As pressure boreholes there are additionally used boreholes located in corresponding zones of density of fracturing at minimal distance from horizontal and/or branched horizontal bores of boreholes.
EFFECT: increased oil yield and efficiency of development of oil deposits.
1 dwg, 1 ex
Title | Year | Author | Number |
---|---|---|---|
PROCESSING OF FRACTURED RESERVOIR | 2013 |
|
RU2526082C1 |
DEVELOPMENT OF FRACTURED RESERVOIRS | 2013 |
|
RU2526037C1 |
DEVELOPMENT METHOD OF FRACTURED HIGH-VISCOSITY OIL DEPOSIT | 2011 |
|
RU2483207C2 |
METHOD OF DEVELOPING OIL DEPOSITS IN FRACTURED RESERVOIRS WITH WATER OIL ZONES | 2015 |
|
RU2578134C1 |
METHOD TO DEVELOP OIL ACCUMULATION IN LAMINAR CARBONATE RESERVOIRS | 2009 |
|
RU2387815C1 |
PROCEDURE FOR DEVELOPMENT OF OIL DEPOSIT IN CARBONATE COLLECTORS COMPLICATED WITH EROSION CUT | 2010 |
|
RU2434124C1 |
METHOD FOR OIL FIELD DEVELOPMENT | 2006 |
|
RU2305758C1 |
METHOD OF DEVELOPING AN OIL FIELD WITH A FRACTURED RESERVOIR | 2017 |
|
RU2657584C1 |
OIL DEPOSIT DEVELOPMENT METHOD | 2013 |
|
RU2513962C1 |
METHOD OF DEVELOPING OIL DEPOSITS IN FRACTURED RESERVOIRS | 2007 |
|
RU2351752C1 |
Authors
Dates
2011-07-20—Published
2010-02-08—Filed