FIELD: oil-and-gas industry.
SUBSTANCE: invention relates to development of oil accumulation by horizontally branched wells, in particular, of thin carbonate formations-reservoirs with depth making, at least, two meters each. Substance claim: Proposed method comprises arranging, drilling vertical branched fill-in well and branched vertical extraction well with horizontal bores, injecting displacement fluid through vertical fill-in wells and draining oil through branched horizontal extracting well. In compliance with this invention, at least, two thin carbonate formations-reservoirs are selected arranged in close proximity to each other and separated by clay bands. Propagation of oil-filled depth of reservoirs over the area of oil accumulation are determined, areas with maximum tolerable oil-filled depth of reservoirs making at least two meters each are selected. Now, branched horizontal well is drilled to simultaneously develop two and more formations-reservoirs, horizontal wellbores are arranged in most permeable intervals of formations. Note here that wellbores are directed along increase in oil-filled depth, while wellbore length is taken to be inversely proportional to its permeability.
EFFECT: higher efficiency, increased oil extraction, reduced costs.
1 ex, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR OIL FIELD DEVELOPMENT | 2006 |
|
RU2305758C1 |
PROCEDURE FOR DEVELOPMENT OF DEPOSIT OF OIL IN LAYERD RESERVOIRS | 2010 |
|
RU2431038C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSITS IN LAYER RESERVOIRS WITH BRANCHED HORIZONTAL WELL | 2016 |
|
RU2630321C1 |
METHOD OF DEVELOPMENT OF CREVASSED-POROUS STRATIFIED RESERVOIR | 2015 |
|
RU2574890C1 |
METHOD FOR DEVELOPMENT OF LAMINAR CARBONATE OIL DEPOSIT | 2015 |
|
RU2599646C1 |
METHOD OF DEVELOPMENT OF OIL POOLS OBSTRUCTED BY EROSION TRENCH | 2007 |
|
RU2334087C1 |
DEVELOPMENT METHOD OF FRACTURED HIGH-VISCOSITY OIL DEPOSIT | 2011 |
|
RU2483207C2 |
PROCEDURE FOR DEVELOPMENT OF OIL DEPOSIT IN CARBONATE COLLECTORS COMPLICATED WITH EROSION CUT | 2010 |
|
RU2434124C1 |
METHOD OF DEVELOPMENT OF MULTILAYER OIL DEPOSITS | 2015 |
|
RU2584190C1 |
METHOD FOR DEVELOPING DEPOSITS IN LAYERED RESERVOIRS | 2022 |
|
RU2787503C1 |
Authors
Dates
2010-04-27—Published
2009-04-21—Filed