FIELD: oil industry.
SUBSTANCE: invention relates to oil industry and, in particular, to development of oil deposit in fractured reservoirs with water-oil zones. Method involves construction of vertical wells. Opened zone of fracturing or decompression of the deposit are determined in each well and oil-saturated interlayers are compacted. Horizontal producers are drilled in oil-saturated interlayers of compacted below the bed roof at the distance of 2-5 m and above oil-water contact at a distance not less than 10 m. Isolate the determined zones on both sides of packers with installation of controlled valves between them. Displacement agent is pumped into injection wells and oil is extracted through production wells until water cut of extracted oil is more than 75 %. After that, in horizontal wells periodic pumping of viscous water-insulating compositions, resistant to erosion by water is carried out. This operation is carried out at open controlled valves to increase pressure from initial at 30-50 %, but not exceeding crack opening pressure manifold. Pumping is performed so that formation pressure is leveled in horizontal shaft of production well and provide even oil displacement from pores collector upward section of bottom water.
EFFECT: technical result is increased oil recovery due to reduced watering of producing wells.
1 cl, 1 ex, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVELOPMENT METHOD OF OIL FIELD WITH WATER-OIL ZONES | 2009 |
|
RU2386795C1 |
PROCESSING OF FRACTURED RESERVOIR | 2013 |
|
RU2526082C1 |
DEVELOPMENT OF INHOMOGENEOUS DEPOSIT BY INCLINED AND HORIZONTAL WELLS | 2013 |
|
RU2524800C1 |
DEVELOPMENT OF FRACTURED RESERVOIRS | 2013 |
|
RU2526037C1 |
DEVELOPMENT METHOD OF SUPER-VISCOUS OIL DEPOSIT WITH WATER-OIL ZONES | 2020 |
|
RU2730705C1 |
METHOD OF DEVELOPMENT OF MASSIVE OIL FIELD WITH LAMINAR IRREGULARITIES | 2010 |
|
RU2439298C1 |
METHOD OF DEVELOPING MULTI-BED MASSIVE OIL DEPOSIT | 2011 |
|
RU2464414C1 |
OIL DEPOSIT DEVELOPMENT METHOD | 2013 |
|
RU2513216C1 |
OIL DEPOSIT DEVELOPMENT METHOD | 2013 |
|
RU2513962C1 |
METHOD FOR DEVELOPMENT OF HIGH DEPOSITS OF HIGH VISCOSITY OIL WITH WATER CONSISTENT ZONES | 2017 |
|
RU2663524C1 |
Authors
Dates
2016-03-20—Published
2015-03-11—Filed