FIELD: transport.
SUBSTANCE: proposed device allows but joint of angular belts 2 of elements of mast 1 arranged one on the other. Both end sections are bolted together, namely, by bolt 7 and nut 8 fitted along vertical axis 10, 18 running inside horizontal section of said end sections. One of said sections comprises cutout 12 open on side to allow access to bolt head 23, 26 to work with wrench 29.
EFFECT: faster mast mounting/dismantling.
8 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
MOUNTER FOR DETACHABLE JOINT OF TOWER CRANE ARM COMPONENTS | 2004 |
|
RU2336220C2 |
BUTT JOINING OF METAL STRUCTURES, PARTICULARLY, TOWER SECTIONS OF TOWER CRANES | 2001 |
|
RU2212374C2 |
DEVICE FOR ASSEMBLING TRUSS METAL STRUCTURES | 1999 |
|
RU2222488C2 |
JOINTING DEVICE TO CONNECT TWO MAST ELEMENTS AND SET COMPRISING TWO MAST ELEMENT AND SUCH JOINTING DEVICES | 2014 |
|
RU2561523C1 |
RAILWAY VEHICLE BRAKE DETACHABLE COUPLING FLEXIBLE PIPE | 1999 |
|
RU2167072C2 |
RUNNING GEAR OF CRANE | 0 |
|
SU1730004A1 |
UNIT FOR MATING CRANE BRIDGE SPAN AND END BEAMS | 0 |
|
SU1822858A1 |
FASTENING JOINT OF CRANE MOVING GIRDER TO COLUMN | 0 |
|
SU1816731A1 |
GIRDER BEAM FOR THE OVERHEAD OR GANTRY CRANE AND A LIFTING CRANE CONTAINING SUCH GIRDER BEAM | 2015 |
|
RU2654840C1 |
FOUNDATION FOR ANCHORING MACHINE | 2012 |
|
RU2583121C2 |
Authors
Dates
2011-08-10—Published
2007-06-27—Filed