FIELD: construction.
SUBSTANCE: jointing device (7) comprises a top part (8.1), the main part (8.2) and two orthogonal connection axes (10, 11). The top part (8.1) comprises two primary jointing planks (12) and two secondary jointing planks (13), attached to the lower angular chord element (3.1). Each primary jointing plank (12) protrudes above the top of the lower angular chord element (3.1) and has primary coaxial passages (15.1) or secondary coaxial passages (17.1). The main part (8.2), which is arranged between primary jointing planks (12) and between secondary jointing planks (13), has the primary holes (15.2) and secondary holes (17.2). Connection axes (10, 11) stretch via primary passages (15.1) and primary holes (15.2) or via secondary passages (17.1) and secondary holes (17.2). Primary plates (20) and secondary plates (21), attached to the upper angular chord element (3.2), produce the appropriate part of the bearing support surface of connection axes (10, 11).
EFFECT: reduced bend in connection axes and increased thickness of bearing support surfaces.
7cl, 8 dwg
Title | Year | Author | Number |
---|---|---|---|
SPLIT JOINT FOR TOWER CRANE MAST ELEMENTS CONNECTION | 2007 |
|
RU2425792C2 |
DEVICE FOR CONNECTION OF TWO DEVICES VIA ETHERNET LINK AND RECEIVING DOCK OF ONE SAID DEVICES | 2013 |
|
RU2584242C2 |
WIRING SYSTEM | 2012 |
|
RU2581624C2 |
REMOTE INTERLOCK DEVICE FOR SWITCHES OF FEEDERS OF ELECTRICAL RAILROAD CONTACT SYSTEM | 0 |
|
SU1049285A1 |
DEVICE FOR CONTROLLING HOPPER LOADING WITH BULK MATERIAL | 0 |
|
SU1114604A2 |
MAST DEVICE | 2012 |
|
RU2496193C1 |
BUTT JOINING OF METAL STRUCTURES, PARTICULARLY, TOWER SECTIONS OF TOWER CRANES | 2001 |
|
RU2212374C2 |
COLLAPSIBLE SUPPORT PYRAMID | 2022 |
|
RU2796214C1 |
WEDGE CONNECTION OF TOWER CRANE SECTION CHORDS | 2003 |
|
RU2257335C1 |
DEVICE FOR REMOTE CONTROLLING AND CHECKING TWO-POSITION OBJECTS WITH PROTECTION UNITS | 0 |
|
SU1226568A1 |
Authors
Dates
2015-08-27—Published
2014-02-11—Filed