FIELD: construction.
SUBSTANCE: in the method the faulty section is closed at both sides. Some liquid is pumped from the faulty section into a mobile reservoir, arranged on a pontoon by means of a pump arranged on the pontoon. The liquid pumping is carried out in the nearest lowered points of the pipeline route arranged at both sides from the place of the repair, with subsequent lifting of the mobile reservoir to a water surface. Pumped liquid flow is determined using instrument readings. The device according to the first version comprises a mobile reservoir made from elastic material and designed mainly for pumping of the liquid product. The device according to the second version comprises a mobile reservoir made from low-magnet steel, equipped with auxiliary units and elements for pumping of gas condensates.
EFFECT: increased operational reliability.
3 cl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF PREPARING MAIN LINE FOR REPAIR AND DEVICE TO THIS END | 2010 |
|
RU2460927C2 |
FPSO PLATFORM | 2010 |
|
RU2441129C1 |
MAIN PIPELINE TO TRANSFER LIQUID HYDROCARBONS FROM OFFSHORE PLATFORM | 2010 |
|
RU2428620C1 |
LONG-RANGE NATURAL GAS TRANSPORT SYSTEM | 2010 |
|
RU2452891C1 |
VESSEL FOR CONDENSED GAS TRANSPORTATION | 2007 |
|
RU2335426C1 |
PROCEDURE FOR PROTECTION OF MARINE STRUCTURES FOR EXTRACTION OF OIL AND GAS FROM EROSION-CORROSION ATTACKS UNDER ICE CONDITIONS | 2010 |
|
RU2430998C1 |
SEA STATIONARY PLATFORM FOR EXTRACTION OF HYDROCARBONS | 2010 |
|
RU2408764C1 |
SURVEY AND PATROL SERVICE SHIP | 2010 |
|
RU2459738C2 |
FLOATING DEVICE FOR COLLECTION OF SPILT OIL IN WATER | 2010 |
|
RU2451133C1 |
METHOD FOR RAPID INVESTIGATION OF ATMOSPHERE, EARTH'S SURFACE AND OCEAN | 2010 |
|
RU2436134C1 |
Authors
Dates
2011-11-20—Published
2010-04-26—Filed