FIELD: machine building.
SUBSTANCE: device for cleaning main line from bottom silt is used. It is composed of flexible web with dead matter provided with hydraulic jets to clean pipeline length. Faulty pipe length is shut off on both ends. Fluid is forced from fault pipe length into mobile intake rigid container. Pontoons arranged in cassettes and in tiers above pipe length to be lifted to lift damaged pipeline length. Device consists of pontoons, container with pump to receive fluid, shutoff valve and slit remover. Said container represents mobile intake rigid container.
EFFECT: higher efficiency and safety.
4 cl, 9 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO PREPARE MANIFOLD PIPELINE FOR REPAIR AND DEVICE FOR PREPARATION OF MANIFOLD PIPELINE FOR REPAIR (VERSIONS) | 2010 |
|
RU2434173C1 |
METHOD OF SUNK SHIP SURFACING AND COMPLEX FOR SURFACING AND FLOATING SUNK SUBMARINES AND OTHER VESSELS | 2012 |
|
RU2479460C1 |
ON-LINE DIAGNOSTIC DEVICE OF MAIN PIPING | 2010 |
|
RU2439550C1 |
FPSO PLATFORM | 2010 |
|
RU2441129C1 |
METHOD FOR EMERGENCY MAINTENANCE OF HIGH PRESSURE PIPELINES | 2010 |
|
RU2442072C1 |
METHOD OF PILOTING SHIPS IN CHANNELS AND SHALLOW INLAND WATERS AND DEVICE TO THIS END | 2010 |
|
RU2446982C1 |
DRILL TARGET DAMAGE PROTECTION DEVICE FOR MOVEMENT OF ICE FLOES | 2012 |
|
RU2493322C1 |
METHOD TO DESTROY ICE COVER | 2010 |
|
RU2452812C1 |
FLOATING DEVICE FOR COLLECTION OF OIL SPILLED ON WATER | 2011 |
|
RU2462555C1 |
WHEEL-TYPE POWERHELM UNIT OF ARTIC VOYAGE SHIP | 2011 |
|
RU2456201C1 |
Authors
Dates
2012-09-10—Published
2010-11-16—Filed